24
5561304
A
T
R
• On models IN and TOP the clean water drainage pipe of the ice bank
13
(if present) must be connected to a siphoned drain. If necessary cut the
pipe to prevent narrowing or rising.
For the floor models, the clean water drainage pipe is already provided with
a siphon inside the cabinet (fig. 15.1); connect said pipe to the drainage
ensuring it is not bent, otherwise it prevents the siphon from draining the
water.
• Connect the discharge pipe to the siphon. Use pliers to tighten the clamp
supplied for a perfect fit (Figs. 15.2-15.3). (Fig. 15.2-15.3).•
• Connection to the mains water supply is carried out with the aid of pipe
T
provided (8mm diameter).
• The pipe terminal
A
(fig. 12) (3/8”) must be connected to the mains supply
by means of a stop cock
R
(not provided).
• Connect the pipe
T
to the stop cock, making sure that the o-ring gasket
is correctly positioned onto the attachment
A
.
• Connect the tube
T
to the connection
7
(
fill
ice
bank
) and fill the ice
tank; once reached the right level, the exceeding water is eliminated
from the draining
13
(fig. 15).
12
13
EN
Reserved to qualified operators - Forbeholdt faglærte operatører - Reserverad för kvalificerade operatörer - Reservert for kvalifiserte operatører - Только для
квалифицированных специалистов
• Take off tube
T
from the connection
7
and connect it in the connection
1
(
in
water
) exerting pressure as shown on picture 11 (IN models) or
picture 14 (TOP and FLOOR models). The connection
7
(
fill
ice
bank
)
has to be disconnected.
• If you need to unfasten pipe
T
(fig. 13):
- press onto the locking ring using an
ø 8mm
spanner while at the same
time pulling on the pipe to extract it.
T
1
11
13
T
7
1
FILL ICE BANK
IN WATER
14
15
15.1
15.2
15.3
Summary of Contents for NIAGARA IB
Page 7: ...7 5561304 RU 1 2 3 5 1 UV C...
Page 18: ...18 5561304...