Introduction: 

This guide aims to give you a quick overview of the 5 basic steps required to install your Watchguard  Digital 

Security  System,  as  well  as  its  basic  operation.  It  is  important  that  you  follow  the  step-by-step  instructions 

detailed in the full installation manual to ensure correct operation and full understanding of the system. 

 

Once the locations for the main control unit and siren are chosen, connect power supplies and turn on the main 

control box key switch and the siren key switch. Now test their operation before mounting the units permanently 

to ensure that they are within the wireless radio range. 

 

 

 

STEP 1. 

 

 

 

                                       

 MAIN CONTROL UNIT

  

                                                         

  

                            

  Choose a convenient mounting location to install the main control  

  unit i.e. close to a phone outlet and power point. Drill mounting  

 holes (7mm Diameter) into the chosen location. Mount the unit on 

 the wall using the supplied screws and wall plugs. 

  
 

CONNECTIONS 

            

 

 

                     

 

 

  

 Remove cover plate then connect the phone line into the left side 

 phone socket. If you are using a phone / fax / PC already at your  

 available phone point, you may plug the lead from your existing  

 device into the right side socket. Plug the power supply into a  

 power point and switch on.  Straighten the wire antenna for  

 maximum wireless range. Now turn the main key switch to the  

 ON position  (do not press the remotes).  

 

WATCHGUARD  DIGITAL V2 

  Quick Start Guide 

Antenna

 

                               

ON 

                            OFF                  

 

                   AC  POWER 

                     SOCKET

 

STEP 2. 

WIRELESS PIR DECTECTORS                                                                                 

 

 

 

 

Power  the  detector  by 

opening  the  case  and 

removing  the  plastic 

insert 

between 

the 

battery  terminals.  Wait  3 

minutes  for  the  detector 

to  warm  up.  During  this 

time  you  can  work  out 

where  you  would  like  to 

locate your detectors. 

 

 

 

To test each detector’s 

mounting location: 

Put  DIP  switch  1  and  3 

on the Main Control Unit  

up.  While  holding  the 

detector  in  the  mounting 

position  open  and  close 

the detector case. 

The  main  unit  will  beep 

once.  If  the  detector 

passes,  you  will    hear  a 

second set of beeps a few 

seconds later. If this does 

not  occur,  you  must 

reposition  the  detector 

and retest. 

 

 

Now you can mount your 

detectors.  Drill  a  5mm 

diameter  hole  into  the 

wall.  Push  the  wall  plug 

into  the  hole  then  screw 

in  the  mounting  bracket. 

The  detector  can  now  be 

pressed  onto  the  swivel 

bracket. 

Re-test 

the 

detector  by  opening  & 

closing the case  and then 

walking 

back 

and 

forward  in  front  of  the 

detector.  The  main  unit 

will  beep  each  time  the 

Red  PIR  Detection  LED 

illuminates.

 

When completed for each individual detector, return all the 

main unit dipswitches to off to exit this test mode. 

 

                 

  

   

 

 

   

 

 