background image

Watchdog Tracker LT 

“Quick-Start” Setup Guide 

 

Package Contains: 

 

                          
 
 
 
 
 
 
 
 

                                    
 
 
   

 

 

*Please inspect package contents and immediately notify 
Elecsys Technical Support at (913) 825-6366 or email 

[email protected]

 if there are any discrepancies.   

Prior to beginning installation of this product, locate 
the serial number of the device on the label attached 
to the back of the enclosure and record it for use in 
setting up the website. 

 

Ser. #_________________________

 

 
 
 
 
 

Tracker LT Wiring Diagram 
 

 

 

Basic Testpoint Monitoring: 

Connect the brown wire to the pipeline lead, connect the yellow wire 

to the reference electrode lead. 

 

Single Coupon (instant-off) Test Station Monitoring:

 Connect brown wire to the pipeline lead, 

yellow wire to the reference electrode lead, and blue/white wire to the coupon lead (Tracker LT 
supports single coupon connection only). 

 

Critical Bond Monitoring:

 Connect th

e red/white lead to the “shunt +” connection, and connect the 

orange/white wire to the “shunt –“ connection.  If structure-to-soil connections are desired, connect 
the brown wire to the critical structure lead, connect the yellow wire to the reference electrode lead, 
and connect the blue/white wire to the second structure lead. 

 

Activation and LCD Display 

 

 

1.  To activate the Tracker Monitor Unit, Press and hold the button on the side of the unit for approximately 4 seconds 

until the “Power” LED turns on solid then release to initialize communication to the website.  While initializing 
communication with the cellular 

network, the LED will flash in a steady “On/Off” sequence.  The LED will turn off 

when the initial communication is completed.  When communication is made with the website, the website will 
send the latest configuration to the unit. 

 

2.  The Tracker unit will obtain measurements for all of the configured channels and forward the data to the website. 

 

3.  The Tracker unit will automatically go i

nto “sleep” mode until the next measurement cycle. 

 
 

Tracker Setup Guide P/N 

81-0059-00

 

REV B 

Adapter (for 3” 
riser pipe 
installations)

 

 

Tracker LT Monitor Unit  

 

Includes monitor unit with connection 
harness cable attached and antenna.   

 

Reviews: