background image

 

6. Hydraulic diagram  

  

Feed

water

MR

MP

[P3]

1

2

PT

PB

EV1

ROM

FR

Rejection

[P1]

3

4

RS

SC3

[P2]

Tank

Type II Water

 

 

 

 

 

 

7. Installation of the equipment  

7.1 Unpacking the equipment  

  - Check that the packaging does not present any kind of damage.  
  
- Carefully unpack the equipment and components.  Note if any component is damaged.  
  
- Check that no element of the system is missing:  

  

 

Micromatic equipment.   

 

Transformer  

 

Spanner wrench  

 

Pipe cutter 

 

1 set of pretreatment cartridges [1] and [2].  

 

1 set of deionization resin cartridges [3] [4]  

 

Tank with level (optional) or Level 

 

User Manual  

 

Water inlet and drainage connection kit.  

  

 

The  equipment  is  self-supporting.    To  handle  the  equipment  pick  it  up  from  the  sides  of  the  base.    Note  the  following 
guidelines to locate and connect your equipment:  

  
  
 

  

MR 

Pressure regulator 

MP 

Pressure gauge 

PT 

Pretreatment 1: Sediment filter, 2: GAC Filter 

PB 

Low Pressure Switch 

EV1 

Solenoid Valve 

ROM 

Reverse Osmosis Membrane 

FR 

Flow restrictor 

TANK 

Reservoir 

RS 

DI Resin 

SC3 

Type II conductivity sensor 

Summary of Contents for Micromatic

Page 1: ...Micromatic DA Equipment User s Manual Rev 7 20 03 17...

Page 2: ...as well as its electrical and hydraulic connection aspects The User Manual also contains additional information about the equipment and settings allowing a better understanding of the operation and ca...

Page 3: ...description 9 5 1 Pretreatment 9 5 2 Reverse osmosis 9 5 3 Deionisation 9 5 4 Type II Water Storage 9 5 5 Automatic operation of the equipment 9 6 Hydraulic diagram 10 7 Installation of the equipment...

Page 4: ...ive atmospheres Environmental pollution permitted Pollution grade 1 No environmental pollution or only dry pollution not conductive Feed water and hydraulic connections The feed water must comply with...

Page 5: ...wer point should not be situated below the equipment Power consumption 24 VA System voltage 24 Vdc Feed water requirements Drinking water according to European or USA standards Maximum Inlet pressure...

Page 6: ...ment inlet in case the water supply must be cut The equipment needs a drainage to collect the rejection water 3 3 Equipment features Production flow 2 5 l h Operating pressure 2 5 6 bar Conductivity c...

Page 7: ...Connection with open tank level detector 1 Rejection Rejection water outlet from the reverse osmosis phase directed to a drainage 2 Tank Water outlet from the equipment to a Type II water storage tank...

Page 8: ...commands Scrolling the menu Value decrease Scrolling the menu Value increase 4 5 3 Acoustic advice The equipment beeps when activating any warning Pressing any key turns off the sound 4 6 Type II Wate...

Page 9: ...with high inlet pressure 6 bar it is necessary to install a pressure regulator before the water inlet to the equipment 5 3 Deionisation The permeate passes through a mixed bed of strong cation anion r...

Page 10: ...ner wrench Pipe cutter 1 set of pretreatment cartridges 1 and 2 1 set of deionization resin cartridges 3 4 Tank with level optional or Level User Manual Water inlet and drainage connection kit The equ...

Page 11: ...et Electrical connection Transformer Power connection 110 230 VAC Socket Type C Europlug Connection to the equipment Rear connection Plug in type Accessible plug in case of need to disconnect the powe...

Page 12: ...ed Do not use Teflon for this connection the connection is fitted with a rubber seal If due to highly polluted inlet water it is necessary to install and additional pretreatment the connection sequenc...

Page 13: ...made including the dispensing faucet Electrical connection First connect the transformer plug in to the equipment Then connect the transformer to the power system The equipment will start automaticall...

Page 14: ...d sent to the tank The icons Equipment in Operation Electrovalve Tank full are activated 8 1 Symbols and meaning Pre treatment change Equipment in operation Deionisation Resin change Tank full Water c...

Page 15: ...pressing the keys and Parameter Value uS Value 10 0 S cm Hour setting 180 Equipment operation hours and time RESET XXX Temperature value 25 0 C To modify the set values take the following steps a Sel...

Page 16: ...25 C 8 3 3 Resetting the pretreatment hour meter When the pretreatment is changed it is necessary to reset the hour meter 1 Access the set up menu Press MODE ESC 2 Press 3 The screen displays the equi...

Page 17: ...3 Turn on the water supply to the equipment 9 2 Resin cartridge replacement Follow the same procedures as when replacing the pretreatment cartridges 9 3 RO membrane replacement The RO membrane should...

Page 18: ...ivered adjusted and calibrated ex works The equipment can be calibrated and adjusted at any time by the Technical Assistance following a calibration pattern according to international standards It is...

Page 19: ...re The lower it is the lower the performance of the equipment Release the pretreatment cartridges and check the degree of fouling If they are very dirty the silting blocks the flow of water Check that...

Page 20: ...0 1 2002 and 61010 1 Corr 2003 Security requirements for electronic measuring control and laboratory use equipments 2004 108 CE Electromagnetic Compatibility Directive Royal Decree 1580 2006 UNE EN 61...

Reviews: