background image

11 March 2020

 

 

1

 

Studio Stove, Studio Oven and Ooh

-

Ah

 

 

Visit 

www.warmington.co.nz

 

for specs, DWG’s and PDF uploads of fires

 

 

Fire, flue system and instructions to comply with AS/NZS 2918:2001

 

 

Keep these Instructions for future reference. Ensure that you have the correct and current installation details for the Warmington fire

 

 

Maintenance and

 

Operating Instructions

 

Summary of Contents for Studio Ooh-Ah

Page 1: ...for specs DWG s and PDF uploads of fires Fire flue system and instructions to comply with AS NZS 2918 2001 Keep these Instructions for future reference Ensure that you have the correct and current installation details for the Warmington fire Maintenance and Operating Instructions ...

Page 2: ...dried naturally while it is stored Use dry timber preferably cut and stored under cover from the previous year PURCHASING THE FIREWOOD The quality of the firewood you burn can have a dramatic effect on the efficiency and operation of the heater The main factors that affect the burning characteristics of firewood are moisture content tree species and piece size The moisture content of the wood affe...

Page 3: ... will give off smoke heavy with carbon dioxide and has an odour Without adequate ventilation concentrations of smoke could irritate or be upsetting Babies small children pregnant women and pets should not be in the area due to these carbon dioxide fumes causing an imbalance in the air quality Open doors and windows and use a fan if necessary After these initial burns the paint will be set and ther...

Page 4: ...hrough the door frame Lift it up holding it horizontally resting on the one side bricks Fit back vermiculite board panel into the firebox back ensuring that it is sitting hard against the back of the firebox Once the vermiculite board back is in place ensure jet inlet holes on the back plate are clear of any obstructions While holding up the steel baffle horizontally insert the opposite side brick...

Page 5: ...2 STEP 3 STEP 4 STEP 5 STEP 6 Remove ash Studio bricks Push baffle right to the back of firebox Tilt Studio baffle on an angle slide in through door frame Move baffle forward to sit on pins Move the back of the baffle up to sit on the pins at the back of the firebox Rotate Bbffle 90 degrees ...

Page 6: ...portant note Remove Airback before fitting Studio wetback Studio Airback WETBACK POSITION Clean Air from 2005 2014 Model Note Wetback can NOT be fitted to fires that are installed in any area that falls under clean air regulations Cut excess BSP pipe off wet back to length To be carried out by Plumber Description Height from Bottom of Unit U 750 Distance Between Outlets V 220 ...

Page 7: ...the door still fitted to the fire Loosen the 4 cap screws on the front of the door that retains the glass using a 3mm allen key and remove the bottom glass retainer No 3 Slide the glass down towards the bottom glass retainer and remove the glass and any shards No 4 Ensure that both glass door surfaces are clean and true STUDIO GLASS FITMENT ...

Page 8: ... slide the glass up and under the top door retainer Repeat for the other side No 6 No 7 No 8 Slide the glass up and into position ensure that the bottom glass retainer holes are clear to take the cap screws Fit the bottom glass retainer IMPORTANT NOTE Nip up the cap screws for the top and bot tom glass retainers DO NOT OVER TIGHTEN AS THE GLASS MAY CRACK OR BREAK ...

Page 9: ... just loose so the door can move with a slight force No 2 Close the door and nip the handle closed Ensure that the handle is only just nipped No 3 No 4 Line up the door across the top of the fire and ensure that it is parallel No 5 Tighten up the cap screws on the top bottom door front first Nip only STUDIO DOOR ADJUSTMENT No 1 ...

Page 10: ...re it is parallel to the unit No 8 Ensure that the door seal is mating with the door frame and making a seal by looking along the door and seal as they mate If it is not mating correctly repeat adjustment process No 9 Check the seal by opening the door and placing a piece of newspaper between the door frame and the door seal close the door and see if there is some resistance when removing the news...

Page 11: ...11 March 2020 11 MAINTENANCE RECORD Date Maintenance work carried out ...

Reviews: