-  If the combi boiler is correctly connected to gas and 

electrical sources;

-  If the combi boiler is supplied from gas and electricity 

sources (if the main switch is open) in a fixed way;

-  If the combi boiler is not in failure situation due to lack 

of ignition;

-  In order to maintain circulation of installation water, 

installation valves and radiator valves under the combi 
boiler must be open.

Under these conditions, the combi boiler is protected 
against frost up to -5°C environment temperature.

Lowest Temperature -5°C.

 In case the combi boiler 

is installed in an environment with a temperature lower 
than -5°C, and gas supply is interrupted or passed into 

failure due to failing to make ignition, Frost Prevention 

System will not be activated and frost/failure might occur 

in the device. Following instructions should be followed 

for preventing the risk of frost:

- Protecting the heating circuit against frost by using anti-

freeze chemicals (special for heting circuits) from a known 

supplier, considering the minimum temperature needed and 

percentage of the antifreeze declared by the supplier

Materials used for manufacturing the combi boiler are 

resistant against glycol and propylene based anti-frost 
liquids. Follow warnings of supplier company regarding their 
lives and possible disposals.

Damages arising from failing to follow above mentioned 
issues and interruption of electricity supply shall be 
excluded from validity of the warranty.

In case the combi boiler is installed at places with 
temperature lower than 0°C (both for tap water ad 
radiator purposes) both heating and hot water circuits 
must be insulated.

2.2.11. Electrical Connections

Electrical safety of the combi boiler is assured only if 
completely connected to an effective earthing installation 
that follows safety instructions in force. No earthing shall 
be made from the neutral line on the socket for places not 
having earthing! It is dangerous and unacceptable to use 
gas and water connection pipes for earthing.

WARMHAUS A.Ş. cannot be held as responsible for any 

damages and losses on individuals or commodities 

arising from failing to provide earth connection of the 

combi boiler and electrical connections not being made 

by a competent electrician in accordance with directives 

and standards in force.

Also, ensure that the electricity installation complies with 
the maximum power to be supplied as indicated in technical 
specifications label on the combi boiler. Combi boiler is 
given with “X” type socketless special power source cables. 
“Warmhaus combi boiler has an IPX5D protection level. 
Power supply cable should be connected by relying on earth 

connection and L-N poles in a 230 V +%10; -%15 50Hz grid, 
high voltage category 3rd class multiple pole disconnector 
should be envisaged on the same grid. Always contact 
Authorized Warmhaus Service for replacement of the cable. 

Power supply cable should follow the defined 
route. In case fuses on the adjustment card are 
replaced, please use 2A or 3,15A speed type fuses. 
In order to feed the device from the general 

electricity grid, adapter, multiple sockets and extension 
cables are not allowed to be used.

2.2.12. Optional Controls: Room Thermostat, 

Outside Sensor and Others

Room thermostat, Outside Temperature Sensor, etc. 
control devices must be connected to Warmhaus combi 
boiler devices by the authorized service personnel; in case 
connections are performed by unauthorized persons, 
combi boiler warranty shall be void.

Room thermostat, Outside Temperature 
Sensor, etc. control devices are provided as 
optional accessories for Warmhaus combi 
boilers and they must be Warmhaus approved.

Please follow Installation & User Manual for installation of 
Outside Temperature Sensor.

This sensor can be directly connected to electrical 
installation of the combi boiler, and it automatically 
reduces the maximum central heating flow temperature 
in the installation when exterior weather temperature 
rises for enabling functioning according to outside 
temperature changes. Outside Temperature Sensor is 
activated when connected as independent from the used 
room thermostat typology and functions as common with 
room thermostats. The relation between central heating 
flow temperature and exterior weather temperature is 
defined according to curves in the diagram with regards 
to the central heating set temperature.

Electrical connection of the Outside weather temperature 
Sensor shall be made to the terminals matching the 2 
white cables (Figure 10). 

Summary of Contents for MINERWA 25

Page 1: ...MINERWA 25 CONDENSING COMBI BOILER INSTALLATION USER MANUAL...

Page 2: ...2 warmhaus com MINERWA 25...

Page 3: ...Emptying Radiator Installation 15 2 3 3 Circulation Pump 17 2 4 CONTROLS FOR INITIAL OPERATION OF COMBI BOILER 18 2 5 COMBI COMPONENTS 18 2 6 COMBI BOILER FLUE CONNECTIONS 19 2 6 1 Exhaust Gas Flue Pi...

Page 4: ...ers authorized by a gas company located at your city should be preferred for performing project and etude studies In order to enable use of the combi boiler with LPG bottles or LPG tanks conversation...

Page 5: ...g more detailed information regarding legal regulations on installation of gas fired heating devices www warmhaus com Manufacturer WARMHAUS Is tma ve So utma Sistemleri Tic A Bursa I ktepe OSB Mah Par...

Page 6: ...L3B P Natural Gas 20 mbar G20 Available DE YES I 2L Natural Gas 25 mbar G25 Available NL YES I 2E Natural Gas 25 mbar G25 Available BE FR YES I 2ELL Natural Gas 20 mbar G25 Available DE YES II 2L3P Na...

Page 7: ...2H3B P Buthane Gas 50 mbar G30 Available AT CH SK YES II 2E3B P Buthane Gas 50 mbar G30 Available DE YES II 2L3B P Buthane Gas 30 mbar G30 Available NL YES II 2ELL3B P Buthane Gas 50 mbar G30 Availabl...

Page 8: ...es operating with natural gas and your gas meter Immediately evacuate the place with gas odour Natural Gas Emergency Line from your neighbour or another suitable place Do not make any intervention on...

Page 9: ...mm 110 mm 379 mm 595 mm 201 mm 129 mm 125 mm 575 mm 598 mm 89 mm 150 11 606 000076 G3 4 GAS G3 4 G3 4 G1 2 G1 2 MODE RESET Do not leave packing materials plastic nylon bags etc at places to be reached...

Page 10: ...ll brick wall according to installation scheme and with connection screws and not to be used for other purposes In case of using different materials for installation combi boiler shall be out of the w...

Page 11: ...gn substances therefore required filter systems must be available in the gas supply line for ensuring purification of the fuel 2 2 7 In Case of Using LPG Tank For heat requirements over 24 kW LPG tank...

Page 12: ...e downwards Figure 8 Combi boiler bottled gas connection LPG LPG Ball Valve COLLECTOR 370 mmH2O 2 kg Hood 12 kg or 24 kg LPG BOTTLE 2 2 9 Filling the siphon for Condensation Line After hanging the boi...

Page 13: ...h connection of the combi boiler and electrical connections not being made by a competent electrician in accordance with directives and standards in force Also ensure that the electricity installation...

Page 14: ...WHEN THE TIMER OR OPENTHERM ROOM THERMOSTAT CONNECTED THE BOILER ROOM THERMOSTAT ORANGE WHITE GREEN W W O O G G COMBI BOILER CONTROL ACCESSORIES RC07 Modulated Weekly Program Scheduled Cable room the...

Page 15: ...ombi boiler can function at minimum 0 5 bar tap water pressure and that corresponds to a very low flow rate and therefore it is quite probable that the requested tap water temperature can not be provi...

Page 16: ...al Drain Gulley or Rainwater Hopper 45 cross sectional drainage pipe outlet Open air flusher Figure 15 Outside Connection of Condensate Water Drainage Pipe SECTION 2 INST Outdoor flusher Condensate Wa...

Page 17: ...r Min 19 mm Inner pipe 75 mm flusher bathroom shower drainage combined with other drainage lines Minimum 30 mm Inner pipe Water Air proof insulation 25 Distance under grid 45 pipe termination 75 100 F...

Page 18: ...3 DHW Filter 34 DHW Inlet 1 3 4 5 6 7 8 10 14 2 18 20 21 24 26 29 30 31 32 34 19 15 16 13 33 9 11 12 23 27 28 25 17 22 Figure 23 Components of Combi Boiler 2 4 CONTROLS FOR INITIAL OPERATION OF COMBI...

Page 19: ...alled without suitable protection against UV and weather conditions to distances over 40 cm and exteriors Every pipe is defined with an explanatory and discriminative Warmhaus mark mentioned in remark...

Page 20: ...t system to which the boiler can be connected condensate flow into the appliance is not allowed Maximum allowable temperature of combustion air 40 C maximum allowable recirculation rate of 10 under wi...

Page 21: ...heat input allowed by the controls are given technical table d G20 CO2 or O2 content of the combustion products at nominal operating conditions 9 0 5 0 5 G30 G31 CO2 content 10 00 tolerance 0 5 0 5 e...

Page 22: ...nal on the same wall 1500 N Horizontally from a terminal on the same wall 300 R From adjacent wall to flue vertical only 300 S From an adjacent opening window vertical only 1000 T Adjacent to windows...

Page 23: ...3_1 press down and tighten the screw Fig 33_6 to secure the flue elbow see picture B Fit the outer and inner wall flanges Fig 33_13 14 on the terminal pipe Fig 33_12 Connect flue to the boiler positio...

Page 24: ...ndard Flue Set Elbow 90 b Flue Extension Pipe c Additional 90 Elbow d Standard Flue Set Pipe Figure 38 II Two 90 elbow sample flue installations d a b c a b c d 9 m Figure 37 I Single 90 bended sample...

Page 25: ...connections 60 100mm vertical flue set should not exceed 11 m A 60 100 mm L max 11 m A Figure 40 Vertical flue set installation ATTENTION For C3 boilers the terminal outlets from separete combustion...

Page 26: ...alent length L8 0 5 m L9 0 5 m 45 elbow equivalent length L10 1 5 m L11 1 0 m 90 elbow equivalent length L12 1 5 m L Total 12 m 12 m Lmax 30 m Correct in implementation Figure 42 Hermetic flue type in...

Page 27: ...e flue pipe The flue and air pipes must extend by at least 40 mm from the wall surface Condensing boiler emit a visible plume of water vapour from the flue terminal this is normal It is the responsibi...

Page 28: ...0 100 Condensing Flue Extension L 1000 mm 153 11 660 600111 Black 153 11 660 600015 White 153 11 660 600118 Grey 60 100 Condensing Flue Extension L 2000 mm 153 11 660 600112 Black 153 11 660 600016 Wh...

Page 29: ...3 11 660 600091 80 Condensing Twin Flue Extension Pipe L 1000 mm 80 mm L 1000 mm 153 11 660 600092 80 Condensing Twin Flue Extension Pipe L 2000 mm 80 mm L 2000 mm 153 11 660 600093 80 Twin Flue Elbow...

Page 30: ...rminal Kit With 1 m Extension and Two Brackets 153 11 660 6000 31 Plume Displacement Kit Elbow 900 153 11 660 6000 32 Plume Displacement Kit Elbow 450 153 11 660 6000 33 Plume Terminal 153 11 660 6000...

Page 31: ...assageway check that combustion products will not cause a nuisance and that the terminal will not obstruct the passageway 3 If a terminal is less than 2 metres above a balcony above ground or above a...

Page 32: ...or control device is connected ensure that it is at ON position If you will shut off the combi boiler for a long period perform below written operations Discharge the radiator installation water not c...

Page 33: ...liminating the failure in case of combi boiler failure MODE Used for Winter Summer OFF mode adjustment Operating modes and related notifications OPERATING MODES EXPLANATIONS CLOSED or OFF WINTER Radia...

Page 34: ...s started flame modulation symbol is seen at the middle section of the screen At that position you can increase and decrease the temperature with CH temperature adjustment buttons see Figure 40 3 betw...

Page 35: ...ons c Failing to follow instructions given in this book and room thermostat booklets Important It is compulsory to have two different lines according to legal regulations being in force regarding elec...

Page 36: ...ng passive active In order to rapidly prepare DHW faster and reducing the cold water consumption during waiting grid water is heated in the plate exchanger and ready hot water is stored Activation of...

Page 37: ...e has a drain cock first turn the boiler off and let the pressure drop to 1 1 5 bar then switch it on again 4 If the pressure increase occurs again call an authorized service E 04 Domestic heating wat...

Page 38: ...E 11 Gas valve modulator disconnected Boiler does not work E11 error code flashing on the screen Gas valve harness 1 Call for authorised service 2 Check gas valve between board and gas valve E 13 Exh...

Page 39: ...aximum allowed consecutive lock out reset reached Usable RESET number reached Too many consecutive lock out failures followed by reset due to other possible causes 1 Removing power supply reset will b...

Page 40: ...me from out side room units or thermosad bridge etc 1 Reset Restart boiler 2 Call for authorised service E 62 Calibration request Boiler does not work E62 error code flashing on the screen Calibration...

Page 41: ...blem on electronic gas valve driver Boiler does not work E80 error code flashing on the screen Electronic board Gas valve failiure 1 Call for authorised service at first E 81 Lock out for combustion p...

Page 42: ...or code flashing on the screen Aging or rust on the electrode Recirculation on fluegas path Blokage on flue or wrong flue Electrode position Cabling disconnections Combustion calibration Electronic bo...

Page 43: ...on Combustion calibration 1 Call for authorised service at first E 96 Flue or air suction way blockage Boiler does not work E96 error code flashing on the screen Blokage on flue Blokage on air suction...

Page 44: ...om as you wish and also you can acquire approximately 6 power saving with every degree of temperature decrease Ventilation Do not leave windows slightly open for ventilating room rooms In such case co...

Page 45: ...hall be performed against payment Our distinguished customer we believe the importance of providing good products to you as well as rendering good services Recommendations and Data to be Followed 1 Wh...

Page 46: ...0 l h flow rate mH2O 7 Pump pressure at 500 l h flow rate mH2O 7 3 Max Pump Flow Rate h 2500 Pump Energy Efficiency Index EEI 0 20 Domestic Hot Water Circuit Maximum DHW Heat Input kW 31 Minimum DHW H...

Page 47: ...ntained in this product information is applicable and valid Electricity Fuel Natural Gas G20 HANDING OVER After completing the installation and commissioning of the system the installer should hand ov...

Page 48: ...n Qfuel kWh 14 809 23 152 Annual fuel consumption AFC GJ 11 18 Condensing boiler Yes Yes Low temperature boiler Yes Yes Combination boiler Yes Yes B1 Boiler No No Room boiler with combined heat and po...

Page 49: ...49 warmhaus com 3 10 ENERGY LABEL...

Page 50: ...50 warmhaus com...

Page 51: ...nt have been carefully prepared but we reserve the right to make changes and improvements in our products which may affect the accuracy of the information contained in this leaflet All goods are sold...

Page 52: ...Minerwa Installation User Manual code 150 11 606 000081 Revision Date R01 11 2019 MINERWA CONDENSING COMBI BOILER INSTALLATION USER MANUAL...

Reviews: