Operating Instruction
English
Type 95001
Safety instructions
7
After finishing mounting and installation works of the air blower and prior to the placing it into
operation the following points must be observed:
Check again all screw connections for tight fit.
Prior to placing the air blower into operation a functional testing must be carried out.