Chapter 4 Liftgate Installation
1
9
Connecting the Controllers
Install the main control unit (CD1) at a suitable place, but the position of the control unit
should ensure that the operator has a good view of the load, the working area and the
loading area, while maintaining a safe distance from the risk zone between the platform and
the body.
All control units should be connected to the correct terminals on the control card. Avoid
running two control units in parallel to each other. If you do, if one control unit fails it will
shut down any others running in parallel to it.
Connecting controller
The most commonly occurring controller (CD Control Device) models shown below. Possible controller models vary
depending on lift model, configuration and relevant market.