PERGOLA 10x8
Vendor stock No. GFS00520F
STEP 13
Parts Required: A1, A2, CC, F, FF, G, O, P1, P2
Align Rail (F) horizontally and connect with Right Cover Lock (P1) that is already connected to Sling Canopy (G). Repeat same
process to Left Cover Lock (P2).
Secure the Rail (F) to Right Post (A1) by placing a Duo Tube Connector (O) over the Insert (F) and using M6*55 Bolt & Washer (CC),
tighten all bolts with Allen Wrench (FF) Repeat Process to Left Post (A2).
Once top post have been secured, repeat process to bottom of Post (A1 & A2).
16
Summary of Contents for GFS00520F
Page 2: ...1 ...