SECTION 'A-A'
DETAIL 'B'
A
A
B
1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
MATERIAL:
FINISH:
t: +44 (0) 1722 744 594 f: +44 (0) 1722 742 096 e: [email protected] w: www.wallgate.com Company Reg No. 156022
THIS DRAWING IS THE PROPERTY OF WALLGATE LIMITED AND IS ISSUED ON THE STRICT UNDERSTANDING THAT THE INFORMATION CONTAINED WILL NOT BE REPRODUCED, COPIED OR USED WITHOUT PRIOR AGREEMENT OF WALLGATE LTD.
A3
Limits: (unless stated)
0.25mm (sheetmetal)
0.10mm (machined)
2.00mm (pattern)
5.00mm (moulded)
c
Wallgate
O 2015 Copyright
Model/Client/Project:
TITLE:
Drg No:
Scale:
All dimensions in mm,
All angles 90 (unless stated)
3rd
REVISION HISTORY
REV
DATE
DESCRIPTION
BY CHKD
4
17/12/2015
Drg No was INS-ALB-01 & 02.
DB
DB
5
04/01/2016
Note 7 correction made.
DB
DB
C
(SEE SHT. 2)
WASTE & OVERFLOW ASSEMBLY,
NOTE POSITION OF SEAL WASHERS,
ENSURE WATER TIGHT FITTING
USE THREAD SEALANT IF REQ'D.
BATH SUPPORT WEDGE
TYP. (SEE NOTE 2 & 3)
ATTACHMENT OF OUTER
SIDE PANEL,
10 OFF SECURITY SCREWS, 8 OFF 50mm LONG,
2 OFF 25mm LONG IN 2 POSNS. THUS:- #.
(TYP. FOR EACH SIDE PANEL)
#
#
NTS
TAP END
OF BATH
FRAME
END PANEL
(C'S'K HOLES
FACING OUT)
OUTER SIDE PANEL
(C'S'K HOLES
FACING OUT)
OUTER SIDE PANEL
(C'S'K HOLES
FACING OUT)
FRAME
APERTURE
TYP.
BATH RUNNER TYP.
LOCK PLATE TYP.
SCREW PLATE TO
CROSS MEMBER, TYP.
INS-ALB-01
SHT. 1 OF 2 SHTS.
BATH INSTALLATION
NOTES.
BATH INSTALLATION ASSEMBLY SEQUENCE
(WARNING:
THE BATH WEIGHT APPROX. 70kg, USE APPROPRIATE LIFTING PROCEDURES).
1. BEFORE FITTING BATH TO FRAME ATTACH TAP HEAD TO BATH (SEE DETAIL 'E', SHT. 2) & IN
ACCORDANCE WITH INSTRUCTIONS SUPPLIED WITH TAP HEAD. ENSURE BUTTON WIRING IS
PASSED THROUGH HOLE IN TOP OF BATH.
2. ORIENTATE BATH SUPPORT WEDGES ON FRAME CROSS MEMBERS TO POSITIONS SHOWN.
CORRECTLY LOCATE BATH INTO FRAME, POSITION THE BATH/FRAME ASSEMBLY INTO THE
INSTALLATION POSITION. MARK LOCATION POSITION OF FRAME ON FLOOR, DETERMINE
POSITION OF SERVICES, REMOVE FRAME & BATH FOR ACCESS & CUT ANY APPROPRIATE
HOLES FOR WIRING,WATER & WASTE - (DUE TO HEIGHT LIMITATIONS UNDER BATH, A WASTE
TRAP FLOOR CAVITY MAY BE REQ'D SEE DET. 'F', SHT. 2). RELOCATE BATH IN FRAME & SECURE
FRAME TO BUILDING THROUGH BATH FRAME MEMBERS.
3. GAIN ACCESS THROUGH BATH FRAME APERTURES, TO SWING BATH SUPPORT WEDGES
(IN 4 POSNS.) IN DIRECTIONS INDICATED, SO AS TO TIGHTLY WEDGE & SUPPORT UNDERSIDE
OF BATH ONTO FRAME CROSS MEMBERS. (LIGHTLY TAP WEDGES TO SECURE IN POSITION).
4. ATTACH SOLENOID WIRING, WATER, WASTE & OVERFLOW PIPING (SEE SHT 2). RUN BUTTON
& SOLENOID WIRING TO CONTROL UNIT LOCATION & CONNECT IN ACCORDANCE WITH
INSTRUCTIONS SUPPLIED WITH CONTROL UNIT.
5. TO ATTACH REAR OF BATH TO FRAME, GAIN ACCESS THROUGH BATH FRAME APERTURE,
INSERT LOCK PLATE SPIGOTS INTO HOLES IN END OF BATH RUNNERS & SCREW PLATES TO
FRAME CROSS MEMBER AS SHOWN. (SEE DETAIL 'B').
6. FIT OUTER PANELS.
a). ALL PANELS TO BE FLUSH WITH BOTTOM OF FRAME.
b). OUTER END PANEL: CENTRALLY DISPOSED ABOUT WIDTH OF FRAME.
c). OUTER SIDE PANELS: FIT END OF SIDE PANELS FLUSH WITH OUTER FACE OF FITTED END PANEL.
NOTE THERE ARE 2 SCREW POSITIONS THUS: # THAT USE SHORTER SCREWS.
7. IN SECURE INSTALLATIONS, IT IS RECOMMENDED TO SEAL GAPS WHERE TOP OF BATH IS IN
CONTACT WITH WALL & AROUND GAPS OF OUTER PANELS WITH ANTI-PICK HARD SET MASTIC.
RECOMMENDED MASTIC IS ARBOKOL 1025 & SIKADUR 33.
ATTACHMENT OF OUTER END PANEL,
4 OFF 50mm LONG SECURITY SCREWS