Instruction & Technical Manual | 29
11.4 Changing the desiccant cartridges
1.
Follow the instructions as indicated below.
2.
Ensure desiccant label is completed. (right)
3.
Repeat the procedure as shown in diagram on both
towers.
Important:
do not fully tighten retaining bolts
until all towers have been serviced. When
complete tighten up all bolts to torque
5nm.
4.
Dispose of desiccant cartridges in
accordance with local waste regulations.
5.
Follow the start-up procedure as detailed
in §10.
A
B
C
D
E
F
G
H
I
J
Service
Date
12,000 hours
24,000 hours
36,000 hours
48,000 hours
60,000 hours
Works overhaul