15
7. Do not work on Ultra-Veyor System electrical system
unless the power cord is unplugged or the power
supply is locked-out tagged-out.
8. Check continuity of all couplings.
2.8
LOCK-OUT TAG-OUT SAFETY
1. Establish a formal Lock-Out Tag-Out program for
your operation.
2. Train all operators and service personnel before
allowing them to work around the Ultra-Veyor
System.
3. Provide tags at the work site and a sign-up sheet to
record tag out details.
4. Do not perform any service or maintenance work
unless motor is OFF and the power locked out.
2.10 ELECTRICAL SAFETY
1. Have only a qualified licensed electrician supply power to the electric model by following ANSI/ NFPA 70 Wiring
Standard. Make certain that the Ultra-Veyor System is properly grounded at
the power source.
2. Install safety decals on Master Control panel as per Section 3 - Safety Sign Locations (pg 17)/
3. Make certain that all electrical switches are in the OFF position before plugging the Ultra-Veyor System in.
4. Turn machine OFF, shut down and lock out power supply (safety lockout devices are available through your
Walinga
®
dealer parts department) and wait for all moving parts to stop before servicing, adjusting, maintaining
or repairing.
5. Disconnect power before resetting any motor or breaker overload.
6.
Replace any damaged electrical plugs,
cords, switches and components immediately.
Summary of Contents for ULTRA-VEYOR SYSTEM
Page 1: ...ULTRA VEYOR SYSTEM OPERATOR S MANUAL...
Page 2: ......
Page 4: ......
Page 19: ...17 3 SAFETY SIGN LOCATIONS Think SAFETY Work SAFELY B A B B SAFETY DECALS BLOWER B A A...
Page 53: ...51...
Page 55: ......