356.805.003
9
Date: 2019-04-04
Track assembly instructions
A typical installation of the track starts from the bottom and then build up as explained from step
1 to 5. Make sure to leave enough space to roll-on the TrackRunner Upright from the bottom or
top, or after securing the first track firmly to a structure.
Consult your Wahlberg distributor or Wahlberg Motion Design for other installation options like
floor standing and similar.
A2
B
C
D
E
WARNING!
Secure track
within range
Ma
x.
1m
(3.
28f
t)
D
A1
C
WARNING!
Secure track
near bottom
WARNING!
Secure track
near top
WARNING! Always
use the tool to align
the gear across tracks
joints
≈
0.5m
(1.64
ft
)
STEP
1
.
Secure the
brackets [
C
] on the first
track [
A1
] from the bottom
and secure it firmly to the
structure (truss or pipe).
STEP
2
.
Secure the
brackets [
C
] on the second
track [
A2
] from the bottom
and secure it just lightly to
the structure and the
connection bracket [
B
].
Also connect the TRUE1
power link.
STEP
3
.
Use the tool [
E
] to
align the rack gear across
the track joints and tighten
the four screws on the
connection bracket [
B
]
before removing the tool.
STEP
4
.
Finally, firmly secure the
brackets [
C
] on the track [
A2
] to
the structure and continue from
step 2 for adding additional tracks
or apply the end covers [
D
] on top
and bottom when the
TrackRunner Upright is mounted,
see page 11 for details.
STEP
5
.
For mounting the
equipment on the
TrackRunner Upright see
page 12.
CAUTION! Leave
enough space to roll-
on the TrackRunner
Upright when needed
Floor
TRUE1
Power link