
42 Commissioning
WAGO
WINSTA®
770
770-629/130-000 WINSTA® Sunblind Box 4 Channel
Manual
Version 1.1.1, valid from HW/FW version XXXX0201XX
7.5
Initialization
After switching on the supply voltage, the sunblind box runs through an
initialization phase and it is ready for operation after approximately 5 seconds. No
separate switching on is necessary.
The positions are lost in case of a power failure!
After a loss of supply voltage, all stored sunblind positions are lost. After a
completely-executed reference operation to any end position, the controller stores
the sunblind position internally.
Behavior after power failure in bus operation
After a power failure, it can take up to 1 minute until the WAGO-I/O-SYSTEM
has recorded the box again and it reacts to control commands.
Pos: 58 /Dokumentation allgemein/Gliederungselemente/---Seitenwechsel--- @ 3\mod_1221108045078_0.doc @ 21810 @ @ 1