![WAGO 750-527 Manual Download Page 31](http://html1.mh-extra.com/html/wago/750-527/750-527_manual_3222645031.webp)
WAGO-I/O-SYSTEM 750
Mounting 31
750-527 4DO 30V AC/DC 2.0A SSR
Manual
Version 1.0.0
Figure 7: Inserting I/O Module (Example)
2.
Press the I/O module into the assembly until the I/O module snaps into the
carrier rail.
Figure 8: Snap the I/O Module into Place (Example)
3.
Check that the I/O module is seated securely on the carrier rail and in the
assembly. The I/O module must not be inserted crooked or askew.
Once the I/O module has snapped into place, the electrical connections for the
data contacts and power contacts (if any) to the head station or to the preceding
and, if applicable, following I/O module are established.