WAGO-I/O-SYSTEM 750 XTR
Commissioning 217
750-495/040-00x 3-Phase Power Measurement Module 690 V
Manual
Version 1.2.0
8.4.2
Tabs “Phase L1,“ “Phase L2” and “Phase L3”
On tabs “Phase L1,“ “Phase L2” and “Phase L3,“ you can configure the user
scaling, D-CTR value, min./max. values and general parameters. These are
stored in the I/O module.
Figure 75: “Phase L1” Tab
•
Specify in the user scaling whether or not you want to take the current
transformer ratio into account when calculating the measured values for the
respective phase. If you do, specify the divisor for the current transformer
ratio, e.g. “40.“ Registers 32 and 39 to 42 are written to. For more details,
see section “Process Image.“