68 Commissioning
WAGO I/O System 750
750-482/000-001 2AI 4-20mA HART NAMUR NE43
Manual
Version 1.0.2
9.3.2
Commissioning on a 750-333, -833 via FDT/DTM
This section describes the most important steps for commissioning the HART I/O
module on a PROFIBUS DP/V1 Fieldbus Coupler (750-333) or Controller (750-
833) using FDT/DTM.
Along with the installed and wired fieldbus node hardware, which includes the
PROFIBUS DP/V1 Fieldbus Coupler (750-333) or Controller (750-833), it is
necessary to install the following software before carrying out the operations
described.
Table 41: Software Required for the Commissioning on a 750-333, -833 via FDT/DTM
Pos. Name
Description
Item-No.:
1 WAGO-I/O-
CHECK
(optional)
Commissioning tool for the
WAGO-I/O-SYSTEM 750
759-302
2 GSD files for PROFIBUS
with installation program /
Series 750, 752 and 755
Fieldbus-specific software
(e.g., GSD files for
PROFIBUS)
750-910
Download:
www.wago.com
3 WAGO
frame
FDT frame application for
parameterization,
commissioning and
diagnostics of devices with
DTM device drivers
759-370
4 WAGO_Profibus_HART
_DTM 759-360
DTM for PROFIBUS
759-360
Both Download:
www.wago.com
5 WAGO_075x-08xx_DTM
DTM for the 75x-8xx
controller
Obtainable from
HART field device
manufacturers
6 HART device DTM(e.g.,
Generic HART DTM from
ICS GmbH)
DTM for parameterization,
commissioning and
diagnostics of HART-
enabled field devices
1.
As is typical for a PROFIBUS application, set up the operating mode “2 AI +
acyclic PROFIBUS services” using the GSD files. You will find more
detailed information on this in the section “Operating Modes“ > … > “Setting
Up via GSD”.
Alternatively you can also open WAGO-I/O-
CHECK
if available. In this
case, proceed as described in the section “Operating Modes Parameters”
> … > “Setting Up using WAGO-I/O-
CHECK
”.
2.
Open
WAGOframe
in “Expert mode”.
3.
Next make sure that the “Device catalog” dialog window is shown on the
right-hand side of the screen. This must be activated under
Device catalog
on the
View
menu.
Click on
[Update]
in the “Device catalog” dialog window.
4.
Open a new project using
New
on the
File
menu.
5.
Make sure that the “Network view” dialog window is shown on the left-hand
side of the screen. This must be activated under
Network view
on the
View
menu. Now move the mouse to
Network
in the tree structure and