80 •
Fieldbus Coupler
Fieldbus Coupler 750-341
WAGO-I/O-SYSTEM
750
ETHERNET TCP/IP
“I/O”-LED is blinking
Test o.k.?
No
Yes
“I/O”-LED is shining
ready for operation
2nd break
1st break
“I/O” LED
1st flash sequence
(Introduction of the
error indication)
“I/O” LED
2nd flash sequence
Error code
(Number of flash cycles)
“I/O” LED
3rd flash sequence
Error argument
(Number of flash cycles)
Coupler/Controller starts up
Switching on
the power supply
Fig. 3.1-4: Signalling of the LED for indication of the node status
g012911e
After clearing a fault, restart the coupler by cycling the power.