OM EZ38 us 1.1 * ez38i400.fm
4-19
4
Control lever base
Raise the control lever base
after stopping the engine.
Control lever base raised:
• All hydraulic functions are locked.
• The upper carriage is secured against rotation. (The swivel unit brake
is enabled.)
• The engine will not start unless the control lever base is raised.
Control lever base lowered:
• All hydraulic functions are active.
• The upper carriage can be rotated.
• The engine cannot be started.
Functional check of control lever base
Perform a functional check of the control lever base every time before you
start the machine.
1. Start the machine.
2. Fold the control lever base down.
3. Travel on open terrain.
4. Secure the danger zone.
5. Stop the machine.
6. Raise the control lever base.
7. Move all control levers and pedals in all directions.
➥
The selected elements must not move.
➥
Work may be performed with the machine.
8. The selected elements move:
➥
Stop operation immediately.
➥
Contact a Wacker Neuson service center and have the malfunction
rectified.
Fig. 82
4
Summary of Contents for EZ38
Page 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Page 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Page 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Page 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Page 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Page 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...