
BA ET16 de* 1.0 * et16w710.fm
7-43
Maintenance 7
7.18 Tracks
Checking track tension
WARNING
Crushing hazard during work under the machine!
Working under the tracks can cause serious injury or death.
►
Do not allow anyone to stay in the danger zone.
1. Park the vehicle on firm, level, and horizontal ground.
2. Raise the machine evenly and horizontally by means of the boom and
stabilizer blade.
3. Place the tracks so that mark
A
is in the middle between drive pinion
B
and track tension roller
C
.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
7. Remove the starting key and carry it with you.
8. Adjust the correct track tension if the play between the track roller and
the track is not 20 – 25 mm (0.8 – 1 in).
Fig. 242
Fig. 243
C
B
A
A
Fig. 244
20 – 25 mm
(0.8 - 1 in)
Summary of Contents for ET16
Page 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Page 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Page 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Page 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Page 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Page 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Page 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...