
BA ET16 de* 1.0 * et16i400.fm
4-17
Putting into operation 4
Assembly
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Tighten hexagon head screws
A
(M6/8.8) to 10 Nm (7 ft.lbs) on the left
and right.
3. Tighten hexagon socket screws
B
(M20/8.8) to 410 Nm (302 ft.lbs) on
the left and right.
Fig. 86
A
Fig. 87
B
Summary of Contents for ET16
Page 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Page 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Page 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Page 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Page 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Page 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Page 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...