
4-22
BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4 Putting into operation
Protective Front Guard structure with integrated FOPS/category I
respectively (option)
DANGER
Danger of piercing/penetration by objects from the front!
Causes serious injury or death.
►
A protective Front Guard structure with integrated FOPS must be
installed in areas with danger from the front (for example pipes, tree
trunks, etc.) and of falling objects.
►
Machine operation is prohibited without a protective Front Guard
structure with an integrated FOPS.
Information
The protective FOPS structure corresponds to category I according to ISO
3449:1998
►
The machine owner must ensure that the hazard situation is evaluated
and that the national regulations are observed.
►
The machine owner must ensure that only work is performed that does
not require any higher protection.
►
Accidents cannot be fully avoided despite equipping a machine with
protective structures.
Assembly
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Remove all mirrors (option).
3. A minimum 2 persons are required for installing/removing.
4. Install the lock nuts and screws on either side.
5. Mounting point for protective structure:
A
(upper)
/C
(lower).
Fig. 91Front Guard with integrated FOPS
(symbolic representation)
Fig. 92Upper mounting point
A
E
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...