
BA ET18, 20, 24 en* 1.5 * et18_20_24w710.fm
7-43
Maintenance
7
Checking the condition and age of hydraulic hoses
NOTICE
Leaks and damaged pressure lines must be immediately repaired or
replaced by a Wacker Neuson service center. This not only increases the
operating safety of the machine but also helps to protect the environment.
►
Leaks and damaged pressure lines must be immediately repaired or
replaced by an authorised service centre.
►
Have hydraulic hoses replaced every 6 years from the date of
manufacture, even if they do not seem to be damaged.
In this respect, we recommend that you observe all the relevant safety
regulations for hydraulic lines, as well as the safety regulations regarding
accident prevention and occupational health and safety in your country.
Also observe DIN 20 066, part Tl. 5.
The article number is marked on the clamping section, and the date of
manufacture is indicated on the hose of each hose connection.
Have a line replaced if one of the following problems is detected:
• Damaged or leaky hydraulic seals.
• Worn or torn shells or uncovered reinforcement branches.
• Expanded shells in several positions.
• Entangled or crushed movable parts.
• Foreign bodies jammed or stuck in protective layers.
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...