
2-4
BA ET18, 20, 24 en* 1.5 * Sicherheit_12072013.fm
2 Safety
2.4
Operation
Preparatory measures
• Operation is only allowed with correctly installed and intact protective
structures.
• Keep the machine clean. This reduces injury, accident and fire
hazards.
• Safely store objects you carry with you in the places provided for this
(for example in the storage compartment, drinks holder).
• Do not carry objects with you that protrude into the operator’s work
space. They can create another danger in case of an accident.
• Observe all safety, warning and information labels.
• Start and operate the machine only with the seat belt fastened and only
from the place provided for this.
• Check the condition and the fastening of the seat belt. Have malfunc-
tioning seat belts and mounting hardware replaced by an authorized
service center.
• Before starting work, adjust the seating position so that all control
elements can be reached and fully operated.
• Perform the personal adjustment at machine standstill only (for
example of the operator seat, steering column).
• Ensure that all safety devices are properly installed and functional
before starting work.
• Before starting work or after interrupting work, ensure that the brake,
steering, signaling and light systems are functional.
• Before putting the machine into operation, ensure that nobody is in the
danger zone.
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...