
BA ET18, 20, 24 en* 1.5 * et18_20_24b510.fm
5-63
Operation
5
5.14 Putting out of operation/back into operation
The specified measures refer to putting the machine out of operation and
back into operation after more than 30 days.
Putting out of operation temporarily
Store the machine indoors if possible.
If the machine has to be stored outdoors, place it on a wooden base (if
possible) and cover it with a watertight tarp to protect it against humidity.
1. Park the machine
– see “Parking the machine” on page 5-8
2. Clean the engine with a high-pressure cleaner in a suitable place
see chapter “7.5 Cleaning and maintenance” on page 7-20
3. Check the machine for leaks and loose nuts, screws and connections.
4. Carefully clean and dry the entire machine.
5. Spray an anticorrosion agent onto bare metal parts of the machine (for
example piston rods of hydraulic cylinders).
6. Apply grease to all lubrication points.
7. Fill the fuel tank completely.
8. Check the hydraulic oil and coolant levels, and add hydraulic oil and
coolant if necessary.
9. Change engine oil.
10.Remove the battery and store it in a safe place. Charge the battery and
perform battery maintenance at regular intervals.
11.Set the fuel cock to
OFF
.
12.Close the air-intake openings of the air filter system and exhaust pipe.
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...