
BA ET18, 20, 24 en* 1.5 * et18_20_24b510.fm
5-59
Operation
5
Immobiliser
A
= operator’s key (blue key)
For starting the machine. Scope of delivery includes 2 keys.
B
= master key (red key)
Information
Store the master key in a safe place. It is only used for coding new keys.
All coded keys are deleted if the key remains in position 1 for more than
20 seconds.
The machine can be started without performing any further settings.
Coding a new key
1. Insert master key
B
in the starter.
2. Turn the starting key to position
1
for a maximum 5 seconds.
3. Turn the starting key to position
0
and remove master key
B
.
4. Now insert the new key or the key requiring coding in the starter and
turn it to position
1
within 15 seconds.
5. This action registers the key.
The procedure is automatically cancelled if no key requiring coding is
detected by the system within 15 seconds. Several keys requiring coding
can be inserted one after another in the starter. Each key must then
remain at least 1 second in position
1
. Coding can be performed for a
maximum 10 keys.
Deleting coded keys
Deleting coded keys is necessary whenever a coded key is lost.
1. Insert master key
B
in the starter.
2. Turn the starting key to position
1
for a minimum 20 seconds.
3. All coded keys are deleted after 20 seconds, and all existing keys can
be re-coded.
The master key code is not deleted during deletion.
Fig. 220Immobilizer key
B
A
Fig. 221Starting with the immobilizer
0
1
2
3
P
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...