BA ET18, 20, 24 en* 1.5 * et18_20_24b510.fm
5-53
Operation
5
Loading material
• Loading material on trucks is easier and more efficient if:
- The machine is positioned at the rear end of the truck.
- The loading platform of the truck is loaded by starting at the rear end.
- Work is performed with the smallest possible swivel angle.
Grading
• Use the stabilizer blade to:
- Fill in trenches.
- Grade surfaces.
• Lower the stabilizer blade to the ground for grading work.
• Set the depth of the layer you want to remove with the stabilizer-blade
lever.
➥
The machine must not be raised by lowering the stabilizer blade.
The clearance between the stabilizer blade and the ground should be
about 1 cm (0.4 in).
Fig. 213Loading material
Fig. 214Grading
Fig. 215Grading
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...