BA EZ17 en* 1.1 * ez17i400.fm
4-25
Putting into operation 4
Check lists
The checklists below assist you in checking and monitoring the machine
before, during, and after operation.
Wacker Neuson does not claim those lists to be exhaustive.
If the answer to one of the questions is
No
, first rectify the cause of the
fault (or have it rectified) before starting work.
The checking and monitoring work listed below is described in greater
detail in the following chapters.
Start-up checklist
Check and observe the following points before putting the machine into
operation or starting the engine:
No.
Question
Page
1
Enough fuel in the tank?
2
Water in water separator and fuel filter checked and
drained if necessary?
3
Correct engine oil level?
4
Coolant level OK?
5
Correct oil level in the hydraulic oil
reservoir?
6
Lubrication points greased?
7
Tracks checked for cracks, cuts, etc.?
--
8
Light system, mirrors, signaling, warning and indicator
lights operational and/or adjusted correctly?
--
9
Windows, mirrors, lights, steps, all pedals and control
levers clean?
--
10
All control levers and pedals in neutral position?
--
11
Control lever base raised?
12
Are other persons required to guide you?
--
13
Attachment safely locked?
14
Engine cover locked?
Filler cap closed tightly?
15
Tools and other loose objects removed?
--
16
Seating position adjusted correctly?
17
Are all visual aids functional, clean and adjusted cor-
rectly?
18
Seat belt fastened?
Summary of Contents for E13-01
Page 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Page 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Page 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Page 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Page 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Page 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Page 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Page 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...