![Wacker Neuson E09-01 Operator'S Manual Download Page 89](http://html1.mh-extra.com/html/wacker-neuson/e09-01/e09-01_operators-manual_3129865089.webp)
BA 1404 en – Edition 2.7 * 1404b330.fm
3-47
Operation
3.27 Towing the track excavator
Safety instructions:
• Ensure that the excavator can be towed safely.
• Use the towing bracket for towing the machine.
• Use the towing bracket only for towing the machine.
• Use a shackle pin with a lock pin.
• Start machine travel slowly!
• Ensure that no-one is close to the towing equipment (towing bar, cable)!
Towing
Danger
!
Keep out of the danger zone of the machine –
Accident hazard!
☞
Ensure that no-one is dangerously close to the excavator.
Caution!
The maximum admissible load of the towing bracket is
2330
daN (5238 lbf).
☞
Use towing bracket
A
.
☞
Secure shackle
B
with the shackle pin and a lock pin.
☞
Install a towing bar or cable of appropriate size to the towing bore.
☞
Pull the machine slowly.
Notice!
Follow the following instructions under all circumstances:
• Do not tow away the machine if it is at a standstill or broken down, otherwise the
machine’s travelling drive can be damaged
• The manufacturer’s warranty shall not apply to accidents or damage caused by
towing.
• No towing away other machines with towing bracket
A
.
Abb. 112: Towing bore
A
B
Summary of Contents for E09-01
Page 8: ...1 6 BA 1404 en Edition 2 7 Ba1404en2_7IVZ fm Table of contents...
Page 23: ...BA 1404 en Edition 2 7 1404b110 fm 1 13 Introduction Overview of safety labels...
Page 171: ...BA 1404 en Edition 2 7 1404b560 fm 5 43 Maintenance DIN 51 502 DIN 51 825 1000156007 1...
Page 172: ...5 44 BA 1404 en Edition 2 7 1404b560 fm Maintenance...