2-4
BA D24 en/us* 1.0 * D24en_us_1_0_200c.fm
2 Safety
2.4
Operation
Preparatory measures
• Operation is only allowed with correctly installed and intact protective
structures.
• Keep the vehicle clean. This reduces injury, accident and fire hazards.
• Safely store objects you carry with you in the places provided for this
(for example in the storage compartment, drinks holder).
• Do not carry objects with you that protrude into the user’s work space.
They can create another danger in case of an accident.
• Observe all safety, warning and information labels.
• Start and operate the vehicle only with the seat belt fastened and only
from the place provided for this.
• Check the condition and the fastening of the seat belt. Have malfunc-
tioning seat belts and mounting hardware replaced by an authorized
service center.
• Before starting work, adjust the seating position so that all control
elements can be reached and fully operated.
• Only make personal settings when the vehicle is at a standstill (e.g.
seat, steering column).
• Ensure that all safety devices are properly installed and functional
before starting work.
• Before starting work or after interrupting work, ensure that the brake,
steering, signaling and light systems are functional.
• Before putting the vehicle into operation, ensure that nobody is in the
danger zone.
Summary of Contents for DV60
Page 8: ...EG 4 BA D24 en us 1 0 D24_1_0_konf fm Declaration of conformity...
Page 16: ...1 8 BA D24 en us 1 0 D24_1_0_100 fm 1 Foreword...
Page 47: ...BA D24 en us 1 0 D24_1_0_300 fm 3 7 Introduction 3 Warning labels Fig 9...
Page 51: ...BA D24 en us 1 0 D24_1_0_300 fm 3 11 Introduction 3 Information labels Fig 21...
Page 56: ...3 16 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction ANSI label option Fig 38...
Page 62: ...3 22 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction...
Page 97: ...BA D24 en us 1 0 D24_1_0_400 fm 4 35 Putting into operation 4 Enlarge camera image Abb 89...
Page 108: ...4 46 BA D24 en us 1 0 D24_1_0_400 fm 4 Putting into operation...
Page 140: ...5 32 BA D24 en us 1 0 D24_1_0_510 fm 5 Operation Notes...
Page 150: ...6 10 BA D24 en us 1 0 D24_1_0_600 fm 6 Transportation Notes...
Page 186: ...7 36 BA D24 en us 1 0 D24_1_0_710 fm 7 Maintenance...
Page 207: ...BA D24 en us 1 0 D24_1_0_900 fm 9 17 Technical data 9 9 15 Dimensions...