
BA D24 en/us* 1.0 * D24_1_0_400.fm
4-43
Putting into operation 4
Connections
1. Move vehicle
Y
close to machine
X
so that the length of the battery
jumper cables is sufficient.
2. Let the engine of vehicle
Y
run.
3. Unlock cover
E
and open.
4. Remove cover from positive terminal
A
.
5. Connect the battery jumper cables in the following order:
A – B – C –
D
.
6. Wait five minutes for the empty battery to be charged a little.
7. Start the engine of machine
X
.
8. Disconnect the battery jump cables in the following sequence:
D-C-B-
A.
Fig. 94
E
_
+
Fig. 95 (symbolic representation)
Starting
battery
D
A
B
C
Summary of Contents for DV60
Page 8: ...EG 4 BA D24 en us 1 0 D24_1_0_konf fm Declaration of conformity...
Page 16: ...1 8 BA D24 en us 1 0 D24_1_0_100 fm 1 Foreword...
Page 47: ...BA D24 en us 1 0 D24_1_0_300 fm 3 7 Introduction 3 Warning labels Fig 9...
Page 51: ...BA D24 en us 1 0 D24_1_0_300 fm 3 11 Introduction 3 Information labels Fig 21...
Page 56: ...3 16 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction ANSI label option Fig 38...
Page 62: ...3 22 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction...
Page 97: ...BA D24 en us 1 0 D24_1_0_400 fm 4 35 Putting into operation 4 Enlarge camera image Abb 89...
Page 108: ...4 46 BA D24 en us 1 0 D24_1_0_400 fm 4 Putting into operation...
Page 140: ...5 32 BA D24 en us 1 0 D24_1_0_510 fm 5 Operation Notes...
Page 150: ...6 10 BA D24 en us 1 0 D24_1_0_600 fm 6 Transportation Notes...
Page 186: ...7 36 BA D24 en us 1 0 D24_1_0_710 fm 7 Maintenance...
Page 207: ...BA D24 en us 1 0 D24_1_0_900 fm 9 17 Technical data 9 9 15 Dimensions...