BA DT10 en - Edition 1.5 * dt10b330.fm
3-23
Operation
Tying down the machine
Danger!
The machine must be loaded and transported properly –
Accident hazard!
☞
It is essential that you read the safety instructions at the beginning of this
chapter and follow any other safety instructions relevant in your country!
☞
Ensure that the authorized maximum height is not exceeded
☞
Secure the tracks of the dumper on the sides.
☞
Lower the skip and the loader unit.
☞
Firmly fasten the dumper onto the platform. To this end, use straps and chains of suffi-
cient size to pass the cables through the lugs provided.
☞
Protect the engine with a simple cover before transporting the machine through heavy
rain.
☞
Ensure that the operator of the transport vehicle knows the overall height, overall width
and overall weight of the vehicle (including the dumper) as well as the applicable statu-
tory provisions for this type of transport in the country in which the transport is occurring
before driving! Tie down the machine.
Fig. 48: Tying down the dumper
Summary of Contents for DT10
Page 5: ...BA DT10 en Edition 1 5 BaDT10en1_5IVZ fm I 3 Table of Contents...
Page 8: ...I 6 BA DT10 en Edition 1 5 BaDT10en1_5SIX fm Index...
Page 16: ...1 8 BA DT10 en Edition 1 5 dt10b110 fm Introduction 1 7 Signs and symbols XX XX...
Page 20: ...1 12 BA DT10 en Edition 1 5 dt10b110 fm Introduction...
Page 38: ...3 8 BA DT10 en Edition 1 5 dt10b320 fm Operation...
Page 89: ...BA DT10 en Edition 1 5 dt10b520 fm 5 27 Maintenance...
Page 98: ...5 36 BA DT10 en Edition 1 5 dt10b530 fm Maintenance...