3-38
OM 28Z3 US – Edition 2.0 * * 28Z3b330.fm
Operation
3.22 Tying down the excavator
Warning!
Improper loading, strapping, and transporting of the machine can be hazard-
ous.
• Ensure that the machine is properly strapped down.
• Read the safety instructions at the beginning of this chapter and follow
any other applicable safety instructions..
• Make sure the authorized maximum height is not exceeded
• Secure the tracks of the excavator at the front, rear and at the sides
• Lower the stabilizer blade and the boom
• Firmly tie down the excavator at the eye hooks
A
onto the platform, with belts or
tracks of adequate size
• Before transporting the machine through heavy rain:
close the outlet of the muffler with a simple cap or suitable adhesive tape
• Make sure the driver of the transport vehicle knows the overall height, width and
weight of his vehicle (including excavator) before departure, as well as the legal
transport regulations of the country or countries where transport is to take place!
Fig. 43: Tying down the excavator
A
Summary of Contents for 28Z3
Page 1: ...Track Excavator 28Z3 OPERATOR S MANUAL 5200005459 1 0 0312 5 2 0 0 0 0 5 4 5 9...
Page 43: ...OM 28Z3 US Edition 2 0 28Z3b110 fm 1 15 Introduction 1 11 Symbols from AG01686 Overview...
Page 52: ...1 24 OM 28Z3 US Edition 2 0 28Z3b110 fm Introduction...
Page 66: ...2 14 OM 28Z3 US Edition 2 0 28Z3b210 fm Safety Information...
Page 142: ...3 76 OM 28Z3 US Edition 2 0 28Z3b340 fm Operation...
Page 146: ...4 4 OM 28Z3 US Edition 2 0 28Z3b410 fm Troubleshooting...
Page 188: ...5 42 OM 28Z3 US Edition 2 0 28Z3b560 fm Maintenance...
Page 198: ...6 10 OM 28Z3 US Edition 2 0 28Z3b610 fm Specifications...