![WABCO OPTIFLOW SIDEWINGS Installation Manual Download Page 52](http://html1.mh-extra.com/html/wabco/optiflow-sidewings/optiflow-sidewings_installation-manual_3106733052.webp)
OptiFlow™ SideWings
Maintenance
9 Maintenance
During normal operation the SideWings must be checked visually for
damage.
Further maintenance during the service life of the components is necessary
for the following parts:
Every 3 month
Gas springs
– Check free movement.
– The Skirts and Flow Conductor Hinged must be kept open by the force of
the gas springs.
Locks
–
– Check free movement.
Check free movement.
–
– The Skirts and Flow Conductor must be lockable and unlockable.
The Skirts and Flow Conductor must be lockable and unlockable.
Every 6 month
Flow Conductor Rotational
– Add oil to the rotation pin valve.
Locks
– Clean off dirt and dust.
Rubber hinge
– Check rubber hinges for defects.
Summary of Contents for OPTIFLOW SIDEWINGS
Page 1: ...OPTIFLOWTM SIDEWINGS INSTALLATION MANUAL...
Page 32: ...32 OptiFlow SideWings Installation Undo the screws on the slider Remove the slider...
Page 45: ...45 OptiFlow SideWings Operation 7 Operation 7 1 Hatches Opening Press the first knob...
Page 48: ...48 OptiFlow SideWings Operation 7 3 Hinged Pillars Pull out the safety pin...
Page 54: ...54 OptiFlow SideWings Appendix 10 2 Example of SideWings Positioning drawing...