background image

Instruction Manual INCU-Line Peltier Cooled

 

Page 

27

 / 

33

 

 

9   CLEANING AND MAINTENANCE OF THE DEVICE 

 

 

Maintenance  (cleaning  of  the  housing  and  the  chamber)  should  be  carried  out  at  least  once  a  week  

(depending on the environmental conditions in the workplace). 

 

To clean products made of stainless steel (INOX) we recommend using cleaning solution dedicated particu-

larly  to  stainless  steel  material.  It  preserves  the  steel  surface  from  permanent  stains  and  retains  aesthetic 

appearance of the product.  

 

INOX  products  are  made  of  stainless  steel,  when  used  in  standard  laboratory  conditions  they  do  not  rust. 

However it is possible that stains (which may look like rust) form on the steel surface (e.g. due to the kind of 

samples that are incubated in the chamber). In such case we recommend using cleaning solution (to clean 

the stains) which is dedicated to this particular application, e.g. Pelox. 

 

 

9.1   Exterior cleaning 

 

1. 

The housing and door should be cleaned with caution, using a soft cloth dampened with water. 

2. 

Only mild cleaning products should be used to clean the device. 

3. 

Electrical parts should not be in contact with water or detergent. 

4. 

Clean the touch screen using a soft cloth for touch screens, or it is possible to use foam for cleaning 
touch screens. 

5. 

USB port

 can be cleaned with a vacuum cleaner to prevent accumulation of dirt inside the socket. 

 

 

Before cleaning the device, it needs to be disconnected from the electrical supply! 

 

When cleaning stainless steel products with dedicated cleaning solution, one should pay 

attention  to  the  suggestions  and  recommendations  given  in  the  user  manual  (or  in  the 

safety data sheet) of the cleaning solution. 

Summary of Contents for INCU-Line IL 112PR

Page 1: ...ors Instruction Manual European Catalogue Numbers INCU Line IL 56PR 390 1031 INCU Line IL 112PR 390 1032 INCU Line IL 240PR 390 1033 Before using the equipment please read this instruction manual care...

Page 2: ...Instruction Manual INCU Line Peltier Cooled Page 2 33 Legal Adress of Manufacturer Country of Origin Poland...

Page 3: ...Instruction Manual INCU Line Peltier Cooled Page 3 33...

Page 4: ...Instruction Manual INCU Line Peltier Cooled Page 4 33...

Page 5: ...16 5 3 Alarm bar 17 5 4 Information panel 17 5 4 1 Status icons 17 5 4 2 Status description 18 5 4 3 Alarms 18 5 5 Setup 19 5 5 1 Data record 19 5 5 2 Event log 20 5 5 3 Statistics 21 5 5 4 Settings...

Page 6: ...Instruction Manual INCU Line Peltier Cooled Page 6 33 11 1 Possible defects 29 11 2 Circuit breaker 30 12 WARRANTY CONDITIONS 30 13 PRODUCT IDENTIFICATION LABEL 31 14 TECHNICAL DATA 32...

Page 7: ...3 You should place samples in such a way to provide proper air circulation in the chamber open the door for the shortest period of time to reduce temperature fluctuations defrost the chamber if you op...

Page 8: ...dditional stainless steel shelf for IL 112PR 1 466 0455 Additional stainless steel shelf for IL 240PR 1 390 0967 Additional reinforced shelf up to 100 kg for IL 240PR 1 390 1035 Basic Software for ILP...

Page 9: ...it has been placed in its final location The INCU Line 56PR and INCU Line 112PR models are stackable You can stack 2x IL 56 PR 2x IL 112PR and you can also place the IL 56PR on top of the IL 112PR Th...

Page 10: ...ny cardboard boxes sponges and other hygroscopic materials for storing the samples since they may increase the relative humidity in the chamber The unit has also been equipped with a drain for condens...

Page 11: ...l provide optimal parameters of temperature stability and uniformity 3 4 Closing the chamber door The ILPR incubators have been equipped with a 2 point lock To close the door turn the handle to the ve...

Page 12: ...2 USB port 3 Access port 30 mm 4 Internal glass door 5 Height adjustable feet 6 Shelf 7 Door 8 Key lock 9 Slide 10 Chamber fans 11 Open door sensor 12 Main power switch 13 Electronic controller with t...

Page 13: ...Instruction Manual INCU Line Peltier Cooled Page 13 33 14 Interface LAN for service only 15 Main power socket 16 Fuse 14 15 16...

Page 14: ...4 1 status informs about the program status The following states are possible ramp set tempera ture program off program is stopped program is running edit start and stop the program for more in format...

Page 15: ...ure is reached Continuous operation press Over temperature temperature for over temperature protection The user can set the over protec tion temperature and once it has been exceeded the program will...

Page 16: ...me without stopping the program press the icon Select value for set temperature by scrolling the screen up or down Confirm change Select days hours and minutes by scrolling the screen in each column u...

Page 17: ...Information about which window is active indicates 5 4 1 Status icons The status of the device is indicated by icons Ramp status Chamber is currently cooling down or heating up to reach set temperatu...

Page 18: ...3 Alarms In this place appears the list of alarms With active alarm the control bar is red The alarm event is displayed in the list with the status alarm active When an alarm event stops the alarm re...

Page 19: ...lable when you press the button 5 5 1 Data record Data record contains recorded temperature values with data and time Data recording interval is 1 minute The maximum amount of data that can be saved i...

Page 20: ...it has been turned on on the main switch DeviceOff the unit has been turned off on the main switch Door opened the door was opened Door open alarm start the door open alarm was activated Door closed t...

Page 21: ...atistics of the currently executed or completed program Statistics are not available if the program is running but has not yet reached the set temperature status ramp Program time countdown starts set...

Page 22: ...re with the records in the database Delete the data from data record and event log first then change the date time You must first delete the data from the data record and from event log and then chang...

Page 23: ...unit is operating If multiple cables have been inserted through the access port and if it is not possible to use the plug secure the access port with adhesive tape If you leave the access port open it...

Page 24: ...e outside door is open Once the light has been switch on a bulb icon will appear on the display 6 6 USB port To transfer data from the unit s memory to the USB memory stick connect the memory stick to...

Page 25: ...ed as plkx file can be opened only by Basic Software for ILPR This program allows you f ex to view the data in the table as a graph It allows you to make a report of selected data range Basic Software...

Page 26: ...the set temperature falls outside of this range the power of Peltier elements is switched off When the temperature returns to within normal pa rameters the device continues to work normally 8 OPERATI...

Page 27: ...incubated in the chamber In such case we recommend using cleaning solution to clean the stains which is dedicated to this particular application e g Pelox 9 1 Exterior cleaning 1 The housing and door...

Page 28: ...ave the door open to allow adequate ventilation 5 Store in temperatures between 0 C and 50 C and relative humidity maximum 70 11 TROUBLESHOOTING Before you contact VWR Service Department 1 Make sure t...

Page 29: ...ange the cable The unit is not cooling down Check if the unit is exposed to direct sunlight Change the location of the unit Check if the unit is located near a radiator Change the location of the unit...

Page 30: ...ace or refund the purchase price of this product to the customer provided it is returned during the warranty period This warranty does not apply if the product has been damaged by accident abuse misus...

Page 31: ...ocal environment VWR will not be held liable for any related omission or for not obtaining the required approval or authorization unless any refusal is due to a defect of the product 13 PRODUCT IDENTI...

Page 32: ...h external touch screen interior stainless steel housing stainless steel linen finished overal dims mm width 590 650 810 height 710 850 1140 depth 690 780 840 internal dims mm width 400 460 600 height...

Page 33: ...Instruction Manual INCU Line Peltier Cooled Page 33 33...

Reviews: