background image

 

 

 

VZR.2515.001IM

 

 

 

CUBE C-05 tripod turnstile 

Installation Manual 

 

27

 

 

Figure 9 

–  Arrangement of the control panel cable wires.  

 

5.3  Access control and management system connection (optional) 

The  ACS  controller  should  be  connected  to  the  terminal  group  

ACCES_IN and ACCES_OUT.  

Identification  of  terminals:  LEFT,  RIGHT,  STOP,  АР,  GND.  The  terminal 

assignment is shown in Table 2. 

Table 2 

–  ACS terminal assignment 

Identification of terminals 

Terminal assignment 

LEFT, RIGHT 

one-time passage left/ right 

(lowest priority) 

STOP 

passage forbidden (STOP mode) 

(medium priority) 

GND 

common terminal 

AP 

free passage in both directions (“Antipanic”) 

(highest priority) 

 

Summary of Contents for OXGARD CUBE C-05

Page 1: ...VOZROZHDENIE LLC OKPD 2 26 30 50 110 TU 26 30 50 007 33120038 2017 APPROVED BY VZR 2515 001 TRIPOD TURNSTILE CUBE C 05 05 2R MODEL VZR 2515 001IM INSTALLATION MANUAL 40 sheets 2021...

Page 2: ...ce of the installation place 9 4 Product installation and dismantling 11 4 1 Equipment required 11 4 2 Product installation 11 4 3 Dismantling the product 17 5 Connecting and setting the product 18 5...

Page 3: ...nstallation and commissioning of the product Before installing the product please read the Operation Manual VZR 2515 001 OM as well Due to constant work on improving the product changes to its design...

Page 4: ...ns contained herein Before starting installation work completely de energize the product DO NOT INSTALL THE POWER SUPPLY UNIT INSIDE THE TURNSTILE HOUSING AS IT MAY RESULT IN ELECTRIC SHOCK TO PERSONS...

Page 5: ...tructed on safety precautions when handling the electrical installations with voltages of up to 1000V ATTENTION FAILURE TO COMPLY WITH THE SAFETY REQUIREMENTS SPECIFIED IN THIS SECTION CAN RESULT IN D...

Page 6: ...subzero temperatures the product shall be pre held in a room with normal climatic conditions for 12 hours Loading and unloading operations should be carried out in compliance with safety regulations...

Page 7: ...lation Manual 7 3 3 2 Visually inspect the product There should be no visible damage on the product 3 3 3 If any damage is found prepare a Claim Report 3 3 4 Figure 1 overall dimensions of the turnsti...

Page 8: ...R OVERTURNING DURING OPERATION INSTALL THE TURNSTILE SECURELY IN CASE OF PRODUCT INSTALLATION ON LOW STRENGTH FLOOR TAKE MEASURES FOR FLOORS STRENGTHENING IN THE PLACE OF INSTALLATION Figure 2 when in...

Page 9: ...Possible free travel of the barrier arm in STOP mode 3 5 Procedure for checking compliance of the installation place ATTENTION THE PASSAGE ZONES SHALL BE ARRANGED TO ALLOW RECORDING OF PASSAGES DURING...

Page 10: ...C 05 tripod turnstile Installation Manual 10 3 5 1 Figure 3 turnstile passage zone arrangement and guidelines on product orientation Recommended scheme Not recommended scheme Figure 3 Turnstile passa...

Page 11: ...of the FHII 12 15 SK type 3 S5 key for the screws with an internal hexagon 4 slot head screwdriver 5 plumb or level 6 steel shims for turnstile leveling 7 round file 8 side cutting pliers 4 2 Product...

Page 12: ...s 12 mm in diameter in the floor for the turnstile stand anchors according to the installation dimensions Position of mounting holes relative to the external dimensions of the turnstile is shown in Ap...

Page 13: ...VZR 2515 001IM CUBE C 05 tripod turnstile Installation Manual 13 Figure 4 Installation dimensions of the turnstile site...

Page 14: ...able conduit or chase 4 2 6 Install the turnstile stand onto the prepared site 4 2 7 Insert cables from the CP PSU ACS and SFAS cables into the turnstile housing after passing them into the turnstile...

Page 15: ...all the turnstile Fix the turnstile stand with three screws Figure 5 2 by screwing them into the appropriate anchors using S5 key for the screws with an internal hexagon Secure the base cover with the...

Page 16: ...VZR 2515 001IM CUBE C 05 tripod turnstile Installation Manual 16 Figure 6 Barrier arm assembly mounting 4 2 9 Remove the protective film from the turnstile housing...

Page 17: ...it for calibration or repair 1 turn the product power off 2 disconnect the product from power supply 3 disconnect the product cable part from auxiliary cables 4 dismantle the barrier arm assembly 5 di...

Page 18: ...ock of barrier arms under the safety enclosure To conveniently connect the turnstile and get access to all necessary contacts the turnstile should be partially disassembled This scope of works include...

Page 19: ...ual 19 Figure 7 Dismounting of the turnstile safety enclosure Slide the enclosure till the end and free access to the rotation mechanism Figure 8 the appearance of the control board and layout of the...

Page 20: ...quired turnstile mode it is necessary press and hold the BUT button until a short beep The turnstile operating mode is selected based on the number of short beeps it is necessary to release the BUT bu...

Page 21: ...VZR 2515 001IM CUBE C 05 tripod turnstile Installation Manual 21 Table 1 shows the turnstile operating modes with different number of signals after pressing the BUT button...

Page 22: ...ntrolled by the control panel the status of the buttons is transmitted to ACCESS OUT outputs p 5 4 2 2 switching between the pulse and potential control modes of the turnstile p 5 3 3 3 the turnstile...

Page 23: ...owered by 12 V DC power supply The maximum consumption is 4 5 A The PSU should be selected on the basis of these parameters It should also be taken into account that voltage drop increases when the su...

Page 24: ...ides a short circuit between the cross board inputs LEFT RIGHT STOP AP and GND Connected ACS system is connected to the same contacts The Control Board contacts are not used when connecting this contr...

Page 25: ...e turnstile is checked according to its main operating modes in this mode 6 Sound accompaniment when pressing the control panel buttons The buttons will beep when pressed the sound can be turned off A...

Page 26: ...simplified control panel UCP 02 is connected through the TJ6P6C telephone socket to the X24 socket with the PULT inscription using the RJ 02 TP 6P6C telephone socket J6P6C RJ 12 6P6C Figure 9 The turn...

Page 27: ...nnected to the terminal group ACCES_IN and ACCES_OUT Identification of terminals LEFT RIGHT STOP GND The terminal assignment is shown in Table 2 Table 2 ACS terminal assignment Identification of termi...

Page 28: ...witch to STOP mode after 5 seconds 4 Free access in both directions can be enabled only in potential control mode by simultaneous feeding of signals to the LEFT and RIGHT inputs or by sequential feedi...

Page 29: ...NC NO and COM close or open when somebody is passing either side through the turnstile When the turnstile enters the AP mode pass counting mode the D9 diode lights up at each pass The NC NO and COM te...

Page 30: ...stile Installation Manual 30 Figure 10 Location of control LEDs on the motherboard Figure 11 To connect the controller it is necessary to remove the safety cover from the turnstile make connections wi...

Page 31: ...he installation locations of the control board and external controller are shown in Figure 10 Figure 11 Installation locations for the external controller and turnstile control board 5 4 Control panel...

Page 32: ...el without the use of controller as to hacking To use this diagram for connecting the turnstile it is necessary to set the control board to mode number 6 using the BUT button see Table 1 With this set...

Page 33: ...VZR 2515 001IM CUBE C 05 tripod turnstile Installation Manual 33 Figure 12 Numbering of the CP buttons...

Page 34: ...TOP button 2 Status of AP button 4 LEFT RIGHT STOP and outputs represent current status of the CP buttons the transistor opens when corresponding button is pressed LEFT RIGHT STOP and outputs can be c...

Page 35: ...Installation Manual 35 Figure 14 wiring diagram for CP connecting to ACS controller The controller controls the turnstile in this variant using the LEFT RIGHT STOP and AP contacts Figure 14 Diagram fo...

Page 36: ...product readiness for use 6 1 1 Check the mounts of the turnstile parts and assemblies 6 1 2 Check that all cables are securely attached 6 1 3 Turn on the turnstile and perform health check by carryin...

Page 37: ...ollows 1 representative of installation contractor demonstrates security of product installation 2 notes on the product installation are made in the Product Service Record Section of the Logbook VZR 2...

Page 38: ...air Total electrical resistance of CP DC power supply wire should not exceed 50 Ohms If this requirement cannot be met additional 12V 100mA PSU can be installed at the CP place minimum operating volta...

Page 39: ...VZR 2515 001IM CUBE C 05 tripod turnstile Installation Manual 39 APPENDIX B Turnstile connection diagram Figure 15 turnstile diagram and diagram of its connections Figure 15 Turnstile diagram...

Page 40: ...Vozrozhdenie LLC 192289 66 Sofiiskaya str Saint Petersburg Russia Telephone Fax 7 812 366 15 94 www oxgard com info oxgard com...

Reviews:

Related manuals for OXGARD CUBE C-05