
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
10
3.
FPVB WIRING , CONT’D
P.
Moving to the front of the vehicle, route the pre-
viously routed FPB power wire near the existing
hood latch cable. (See Fig 3-l).
Q.
Continue to route the power wire around the
radiator core support securing the wire with the
supplied nylon ties. (See Fig 3-m)
R. Solder or crimp the supplied ring terminal and
fuse holder to the end of the FPB power wire.
S.
Secure the power wire to the power distribution
box using a 10mm wrench and secure the cover.
(See Fig 3-n).
T.
Install the supplied 40A fuse into the fuse holder.
Fig. 3-l
Fig. 3-m
Fig. 3-n
Fig. 3-o
HOOD LATCH
CABLE