S
OFTWARE
Page 66
© Voltech 2010
Power Analyzer User Manual
Next click “Start Flicker Test” to start the test. The program will wait thirty seconds to
allow measurements to settle and then start the ten minute measurement routine.
While the program runs, the values for maximum IFS and current IFS will continuously
update. After the program finishes running, the PST value will be calculated and
displayed.
Reporting Results
By default the software will display the Main Table Report and the Test Parameters
Report. To view other results, click on Results → Open Harmonic Files from the top-
level menu to view harmonics files or Results → Open Flicker Files. This will open up
a window that allows you to select the results you would like to see.
Open Harmonic Results
On the left, select the set of results desired. Then on the right, select the reports that
you desire to view.