13
5.
After correctly hooking the device on the installation template, now the device
is ready for operation.
Ensure there is enough space for the correct
function of the manual cable lock release
trigger. Otherwise during the operation, the
cable may not be properly locked on the device.
4.3.
Cable Installation
Ensure the AC input power supply is completely
turned OFF during the whole wiring procedure.
Make sure the unit is correctly connected a
grounded, metal, permanent wiring system, or
an equipment grounding conductor.
L1
Phase 1 (brown)
N
Neutral (blue)
L2
Phase 2 (black)
PE
Earth
(yellow & green)
L3
Phase 3 (grey)
✓
Connect the three phases according to the color indications for power of 22 KW
and single phase connect Phase 1 (properly identified on the cable) for the power
of 7 kw;
FIGURE 8 Wiring indications