Volkswagen Motorsport
Volkswagen Golf
GTI
TCR SEQ User Manual
Volkswagen Golf GTI TCR SEQ User Manual
Page 52
5
WORKSHOP MAINTENANCE
5.1
First roll-out
Volkswagen Motorsport checks all cars in a roll-out before customer delivery. This roll-out consists in:
.
-
5 circuit laps.
-
High speed in a long straight.
-
Start rev limiter checking simulating a standing start.
-
Speed limiter function checking.
-
After the roll-out, VWMOSP engineers check the data acquisition and all car functions.
Notes:
Although VWMS does a roll-out, it is strongly recommended to carry out a suspension check before first
customer roll-out and after the first practice. Pay special attention to sub-frame, power train, engine
brackets, fixations, etc.
5.2
Check-list
After any rebuild or main job it’s recommended to carry out a check-list. It is possible to do it using the Live
Measures view in RaceStudio3 and a laptop or directly using car’s display.
Check-list with engine stopped
OK
ENGINE
Oil level
On the dipstick mark / T_oil > 70⁰C
Coolant level
On the bottle mark
BRAKES
Brake fluid
On the bottle mark
Steering wheel functions
OK
STEERING
WHEEL
Rain lights
Cockpit fan
Display change
Safety brake signal
Windscreen water
Wiper
High beam
AIM Live
Check-list with engine at idle speed
OK
ENGINE
Water temperature
87ºC / 92ºC (thermostat cycle)
Electrofan
Active at 92ºC
P_ENG_OIL (WT<25ºC)
4 bar
P_ENG_OIL (WT>25ºC)
2,5 bar
P_FUEL
> 4,1 bar
Battery voltage
> 13,5 volts
Boost pressure
0,3 bar @ 2500 rpm
Speed limiter
Check all speed limitations
GEARBOX
Tip
Gear display
Potentiometer values
P_CLUTCH