
Hardwire 3-Pin Binding Instructions
HARDWIRE 3-PIN
TELEMARK BINDINGS
Hardwire Hook Installation:
The Hardware Heel assembly is pre-installed on your Hardwire 3-Pin binding. The following
information is provided if you remove and re-install the Hardware Heel assembly.
Important! When installing the Hardwire heel assembly, the hooks must be installed from
the top. If installed from the bottom, the assembly may fall off during transport.
(SEE
FIGURE 1)
If you need to re-install the Hardwire Heel Assembly to the Hardwire 3-Pin toe-piece you must
install before mounting the toe-piece to the ski. To ensure absolute security of the heel
assembly the hooks must be installed from the top. The hooks cannot be removed unless you
completely unthread the cartridges from the hook rod.
Sizing:
Correct adjustment of the heel lever will provide an audible snap when the
lever is engaged. With most boots, when the lever is not engaged it should
rest roughly 1/4”/6mm back from the boot heel. To adjust the length of the
heel assembly, simply spin the cartridges evenly clockwise to tighten and
counterclockwise to loosen. When the rods are at their maximum length
the threads will appear.
Threads should never be exposed!
(SEE RIGHT)
At
their minimum length the rod will bottom out on the back of the spring
cartridge and begin pushing out the silver colored spring rod. At this point
you cannot make the heel assembly length any shorter.
YES
NO
Checking the forward pressure:
After you initially fit your boots, it is necessary to check the forward
pressure of the heel piece. Release the heel lever from the boot. Note
a scribed mark at the edge of the plastic collar on the spring
cartridge. (SEE FIGURE 2) Now engage the heel lever and check the
distance from the mark to the back collar. The distance should be at
least 1/8” or 4mm and no more than 1/4” or 6mm to ensure optimal
flex and heel retention. (SEE FIGURE 3) The forward pressure may
need to be readjusted after your initial ski runs.
HARDWIRE
MONDO PT SIZE
STANDARD
27 - 31
SHORT
24 - 26.5
273mm - 322mm
305mm - 350mm
*SOLE LENGTH
Boot sizes are for general guideline. Actual sizes may vary
with each boot manufacturer.
Voilé recommends an
authorized dealer for all
binding mounts. Mounting
instructions are written
for shop technicians that
have technical expertise
in mounting telemark
bindings.
Figure 1
Figure 2
Figure 3
2
Toe-pieces
2
Complete Hardwire
2
20mm V-120
2
Dual LP Climbing Heels
2
Dual LP 2mm Spacers
2
100mm Climbing Wires
2
65mm Climbing Wires
18
3/4” (19mm) Screws
4
Flat Washers
for heel pad screws
2
Dual LP Slot Pugs
1
Paper Mounting Template
PARTS LIST