background image

V3-204

VIVREAU BOTTLING SYSTEM

 COMMISSIONING INSTRUCTIONS 

Confirm that the proper services are available. The water 

supply 

must be a ½” water line with 

a ½”

 

threaded ball valve female end. Anything smaller than ½” is not acceptable and should 

never

 

be

 

used. The electrical outlet must be within the range of the power cord of the 

machine,

 

extension

 

cords should never be used. CO2 is also provided by the customer in 

either a tank

 

or with a line

 

from a bulk or remote system. If connecting to an existing system 

the

 

customer must provide a ¼”

 

barbed shutoff within 40” of the installation.

If any of the required services are missing/incorrect or if you have any questions regarding 
the commissioning instructions, please call 877-999-1044 option #5, and someone from our 
Tech Support Team will provide further instructions.

Open equipment packaging and inspect for damage.  Make sure the legs are level, adjust if

 

necessary.  If anything is damaged or missing call the Vivreau service number and report the

 

missing or damaged parts.

Locate the installation instructions and checklist, confirm all parts are included using the

 

installation parts diagram included with the paperwork.

Make the connections at the customer water supply, check valve and filter head, but do not

 

connect to the back of the machine yet. The filter head can be mounted on a wall or onto

 

the 

back

 

of the machine.

Remove the rear water bath access plug. Place the drip tray upside down on the counter to

 

prop

 

up the front legs. Slowly fill the water bath using the water supply line. Once full level

 

the machine

 

and replace the plug.

Connect the water supply to the back of the machine and secure with a red clip.

Connect the CO2 tank or the customer supplied CO2 line to the provided CO2 regulator and

 

set

 

pressure as per instructions. If connecting to bulk CO2 or an existing system make sure

 

the

 

customer has provided the CO2 line with the ¼” barbed shutoff. The general setting for

 

CO2 is

 

between 65 and 

7

0 PSI. Connect the regulator to the rear of the machine and secure

 

with a red

 

clip.

B

ot

tl

in

g S

yst

em

 C

om

m

issi

oni

ng I

nst

ruct

ions

 

vivreauwater.com 

Tel:  877-999-1044 (Option #5 for Tech Support)

Reviews: