vivreauwater.com
Tel: 877-999-1044 (Option #5 for Tech Support)
V3-201 and V3-202
VIVREAU BOTTLING SYSTEM
COMMISSIONING INSTRUCTIONS
Confirm that the proper services are available. The water must be a ½” water line with a ½”
threaded ball valve female end. Anything smaller than ½” is not acceptable and should
never be used. The electrical outlet must be within the range of the power cord of the
machine, extension cords should never be used. CO2 is also provided by the customer in
either a tank or with a line from a bulk or remote system. If connecting to an existing
system the customer must provide a ¼” barbed shutoff within 40” of the installation.
If any of the required services are missing/incorrect or if you have any questions regarding
the commissioning instructions, please call 877-999-1044 option #5, and someone from
our Tech Support Team will provide further instructions.
Open packaging and check for any damage, check the front feet are in a level position.
Do not connect the machine to the electrical supply just yet.
Remove rear top access panel and gain access to chiller water bath. ( Figure 1)
Assemble and install Tap Font using supplied installation kit. *V3-202 taps must be directly
above the system, tap lines should never be extended.
Connect Water line to street water outlet using supplied kit and diagram. Water supply
must be 1/2" supply.
Fill chiller water tank until the water level overflows into the waste container.
(Figure 1)
Connect street water pipe to the machine and insulate the pipe fully, but do not turn the
water on just yet. A minimum water supply of 55psi should be supplied to the machine or
the dispense operation will become slow and may need
a booster pump. (Figure 3)