background image

Scan the QR code with your mobile device or follow the link 

for helpful videos and specifications related to this product.

Instruction Manual

https://vivo-us.com/products/bee-hv02

SKU: BEE-HV02

Shallow Super Beehive Box

[email protected]

 www.vivo-us.com

 309-278-5303

Chat live with an agent! 

GET IN TOUCH

 | Monday-Friday from 7:00am-7:00pm

 CST

Summary of Contents for BEE-HV02

Page 1: ...pful videos and specifications related to this product Instruction Manual https vivo us com products bee hv02 SKU BEE HV02 Shallow Super Beehive Box help vivo us com www vivo us com 309 278 5303 Chat live with an agent GET IN TOUCH Monday Friday from 7 00am 7 00pm CST ...

Page 2: ... call a qualified technician Check carefully to make sure there are no missing or defective parts Improper installation may cause damage or serious injury Do not use this product for any purpose that is not explicitly specified in this manual and do not exceed weight capacity We cannot be liable for damage or injury caused by improper mounting incorrect assembly or inappropriate use WARNING IMPORT...

Page 3: ...panels B1 B2 together to make a box Use a hammer and block or rubber mallet to secure tightly As the wood can expand and contract with shipping some filing may be needed to align the dovetails ASSEMBLY STEPS Hive Boxes Matching boards should be across from one another Make sure all 4 handles are facing out and towards the top ...

Page 4: ...faces down and the sides face each other STEP 3 Repeat steps 1 and 2 for each additional box STEP 2 OPTION 2 Assembling With Nails The super can be nailed together but is not re quired Pre drill holes in the center of each leg of the pre cut joint to prevent wood splitting Then hammer in one nail B3 at a time Check to make sure box is still aligned every so often Avoid nailing into the very top an...

Page 5: ...ndation F4 into the groove of the top bar STEP 3 Put a small dab of wood glue on each ends of the end panel Attach the bottom bar F5 into the final notches of the frame Push down until the fit is snug Bottom Bar View from Bottom ...

Page 6: ...Side View of Bottom Bar with 2 long nails nailed down into side panels Aerial View of Bottom Bar with 2 long nails nailed down into side panels STEP 4 Place two gray nails F3 at one end of the top bar spaced evenly and hammer into the end panels Hammer another two gray nails on the opposite end of the top frame bar in same manner Aerial View of Top Bar with 2 long nails nailed down into side panel...

Page 7: ...frames place the frames in the boxes Push the frames together in the middle Optional Step Hammer the bottom board to the bottom of the deep box using spare nails left in the package to secure hive when transporting or during heavy winds SUGGESTION Coat the exterior wood with chemical free Tung oil or prime and paint the exterior surfaces Leave the interior untreated This will protect hive from wea...

Page 8: ...sure you have a fully functioning product FOR MORE VIVO PRODUCTS CHECK OUT OUR WEBSITE AT www vivo us com help vivo us com AVG RESPONSE TIME within office hrs 1HR 8M 23 within 15m 38 within 30m 61 within 1hr 83 within 2hr 92 within 3hr Love your new VIVO setup and want to share Tag us in your photo vivo_us AVG RESOLUTION TIME within office hrs 15 M www vivo us com Chat live with an agent AVG RESOL...

Reviews: