Installation of Flat Shower Trays
Installation of Zero-to-Surface Shower Trays
8
1- The shower tray is placed in the installation area the levelness of which should be checked with a scale. The protective folio is removed from the
sides touching the wall and from around the siphon (Note: The remaining protective folio on the shower tray should be removed only alter the
installation of the shower tray and all other construction work in the bathroom are completed).
2- Remove the protective folio around the siphon.
3- Make the siphon connection. Seat the shower tray in the installation area.
Note:
If the siphon outlet connection is to be made with a long flexible hose, before installing the siphon it should be installed on the shower tray. The
flexible hose is installed to the siphon outlet pipe at the muff side. The other end of the flexible hose is connected to the muff of the waste water
outlet in such a way to provide leak-proof ness and it is tested for leak-proof ness.
4- Apply silicone between the shower tray and the floor tiles to ensure leak-proof ness.
5- Apply silicone between the shower tray and the wall to ensure leak-proof ness.
6- Additional edge lath application can be carried out if required. However isolation between wall and shower tray must be ensured before the
application of edge lath. The edge lath is installed by applying silicone along the length of both surfaces of the edge lath which will come into
contact with the shower tray and the wall.
7- The installation of the monoblock shower tray is complete. Any protective folio remaining on the shower tray should be removed only after all of
the construction works in the bathroom are finished.
5- After the siphon is placed and its connections are carried out fill the low floor grounding where the shower tray will be seated into with a mixture
of cement and humid sand up to the flooring level without covering the siphon. (The purpose of this application is to fill with cement and sand
mixture in order to prevent any flexing of the shower tray.)
6- Support the siphon seal with silicone.
7- Place the shower tray in the installation area. Make the siphon filter connections and complete the siphon installation. Perform leak-proofing test
with water. Check the levelness of the ground with scale. (At this stage, remove the protective folio of the shower tray from the sides of the
product that contact the walls and from around the siphon. The remaining protective folio on the shower tray should be removed only after the
shower tray installation and other construction works in the bathroom are finished).
8- Glue the waterproof membrane which is fixated on the shower tray to the wall from the front and rear sides with the ceramic adhesive.
1- Prepare a low floor installation area with the shower tray’s dimensions for the zero surface shower tray.
2- Check the suitability of the low floor installation area by temporan1y placing the shower tray in its place.
3- Mark the placement of the shower tray’s outlet, vertically through its center.
4- Place the siphon at the marked location and make the connection to the drain.
Summary of Contents for ACRYLIC SHOWER TRAYS