© 2019
Order #XXXXX
*
Completed Front View
Completed Back View
5
Counter Top
Shelf
1
2
6
5
4
8
7
8
Shelf Support
Shelf Support
Shelf Support
Shelf Support
Shelf Support
7
3
Item
1
2
3
4
5
6,6A
7
8
Qty.
1
1
1
1
2
1,1
2
2
Description
38” GS220 Extrusion w/ 34.417” L-Channel
38” GS220 Extrusion w/ Door Hinges
38” GS220 Extrusion
38” GS220 Extrusion
33.026” Z45 Curved Extrusion
74.815” Z45 Curved Extrusion
24.813” Z45 Extrusion
24.813” Z45 Extrusion
Steps:
1) Attach lower extrusions [5] [6] and [7] between
vertical extrusions [1] [2] [3] and [4].
2) Slide infills between [1] [2] [3] and [4], making
sure Velcro is facing inward.
3) Secure infills with upper extrusions [5] [6A] and [8].
4) Attach door to vertical [2]. See
Door Connection
detail.
5) Connect shelf supports to Velcro on infills.
6) Place shelf on top of supports.
7) Lock counter top to extrusions [6A] and [8]. See
Counter Top Lock
detail.
*
*
6A
Door
Infill
Infill
Infill
Keep L-channel attached to extrusion [
1
].
Door
Hinge
Hinge
Pin
Slide pin into
hinge attached
to vertical.
Slide door
hinge over pin.
Door Connection
*
Align hole with pin
Rotate pin. Spring
will push pin into hole.
Counter Top Lock
1
2
*
Pin
Hole
*
*
MOD-1567 Counter
If you would like to tell us about your experience with your setup instructions please email us at
SETUP INSTRUCTIONS