background image

V

V

E

E

R

R

T

T

E

E

X

X

 

 

 

 

I

I

N

N

T

T

E

E

G

G

R

R

A

A

T

T

I

I

O

O

N

N

 

 

P

P

R

R

O

O

C

C

E

E

D

D

U

U

R

R

E

E

 

 

 

24-00163-00 

2 2   O c t   2 0 0 9    

 

F O R   I N T E R N A L   U S E   O N L Y  

T h i s   d o c u m e n t   c o n t a i n s   c o n f i d e n t i a l   i n f o r m a t i o n   t h a t   i s   p r o p r i e t a r y  t o   Ar i s t o c r a t .   I t   m a y  n o t   b e   c o p i e d   o r   d i s c l o s e d   t o   u n a u t h o r i z e d   p a r t i e s .                    
©   2 0 0 9   Ar i s t o c r a t   T e c h n o l o g i e s   Au s t r a l i a   P t y  L i m i t e d .   Al l   r i g h t s   r e s e r ve d .  

7

  o f   8  

 

S

S

T

T

E

E

P

P

 

 

7

7

:

:

 

 

 

 

 

 

L

L

i

i

n

n

k

k

 

 

C

C

a

a

s

s

i

i

n

n

o

o

 

 

w

w

i

i

t

t

h

h

 

 

V

V

e

e

r

r

t

t

e

e

x

x

 

 

 

A

A

.

.

 Select 

Casino Management 

from the 

Modules 

dropdown menu.  

B

B

.

.

  On the 

Casino Management

 main window, click the 

Add 

button

 

 to open the 

Casino List

C

C

.

.

  Enter the name and address of the Casino associated with the order, and click 

Save

 

 

S

S

T

T

E

E

P

P

 

 

8

8

:

:

 

 

 

 

 

 

L

L

i

i

n

n

k

k

 

 

M

M

a

a

c

c

h

h

i

i

n

n

e

e

s

s

 

 

w

w

i

i

t

t

h

h

 

 

V

V

e

e

r

r

t

t

e

e

x

x

 

A

A

.

.

  Select 

EGM Management

 from the 

Modules

 dropdown menu

.

 

B

B

.

.

  On the

 EGM Management 

main window, click the 

Add 

button

.

 

C

C

.

.

 When 

the 

Add EGM 

box

 

appears

enter the EGM ID (noted earlier) of the first EGM. 

D

D

.

.

 Click 

on 

the 

Casino

 dropdown window, and select the property associated with the order. 

E

E

.

.

 Click 

the 

Add

 button 

to complete your entry. 

F

F

.

.

  Repeat Steps B thru E for all remaining EGMs in the Bank. 

 

The EGM ID must be 
entered in the following 
format:  

 

ATI_GEN7_XXXXXXXXXX

 

Summary of Contents for Aristocrat Vertex

Page 1: ...t y y 25ft CAT6 Cable 07 21139 1 24 Port Switch 07 30086 1 Vertex Jackpot Controller 579849 1 Test Cart Equipped with LCD Monitor USB Keyboard with Built in USB Hub USB Mouse Vertex Power Cord Vertex CAT5 Cable N A 1 PROCEDURE S ST TE EP P 1 1 M M o o u u n n t t a a n n d d C C o o n n n n e e c c t t V V e e r r t t e e x x A A Retrieve the Vertex Jackpot Controller and Switch box from Tek Chek ...

Page 2: ...ide the designated shelf on the conveyor B B Connect the CAT5 Vertex cable to the Switch C C If necessary disconnect the existing CAT5 cable from the Carrier Assembly D D Connect the Retractable CAT5 Machine cable to each corresponding EGM E E For each CAT5 Machine cable connected plug the corresponding Switch cable into the Switch FOR EXAMPLE If Retractable CAT5 Cable No 1 is connected to an EGM ...

Page 3: ... i c c a a t t i i o o n n A A Turn the Vertex Jackpot Controller ON switch is located on the front of the box B B When the Vertex Shell appears on the Test Cart LCD make note of the Vertex IP Address lower right for future reference you ll need it to link the Jackpot Controller with the Bank S ST TE EP P 4 4 L L i i n n k k V V e e r r t t e e x x w w i i t t h h B B a a n n k k Proceed with the ...

Page 4: ...k C C o o n n t t i i n n u u e e d d C C On the G2S HOST SETUP menu follow the onscreen instructions to add host address D D When the onscreen keyboard appears on the EGM Main LCD enter the Vertex IP Address The Host Address Vertex IP Address MUST be entered in the following format Vertex IP address g2shost For example 192 168 1 21 g2shost E E When finished entering the Vertex IP Address click th...

Page 5: ...C C o o n n t t i i n n u u e e d d H H Follow the onscreen instructions to return to the previous menu G2S CONFIGURATION MENU I I On the G2S CONFIGURATION MENU select Communications Setup J J When the G2S Communications Setup screen appears make note of the EGM ID K K Follow the onscreen instructions to return to the previous menu to the Operator Mode Menu L L Turn the Audit Key to reboot the mac...

Page 6: ... reserved 6 of 8 S ST TE EP P 5 5 S S t t a a r r t t C C o o n n t t r r o o l l l l e e r r C C o o n n t t i i n n u u e e d d C C Click OK to return to the Vertex Shell D D Verify the Controller is Running The Controller must be Running before moving onto the next step S ST TE EP P 6 6 L L o o g g i i n n t t o o V V e e r r t t e e x x A A On the Vertex Shell double click User Interface B B L...

Page 7: ...he Casino Management main window click the Add button to open the Casino List C C Enter the name and address of the Casino associated with the order and click Save S ST TE EP P 8 8 L L i i n n k k M M a a c c h h i i n n e e s s w w i i t t h h V V e e r r t t e e x x A A Select EGM Management from the Modules dropdown menu B B On the EGM Management main window click the Add button C C When the Ad...

Page 8: ... e e r r t t e e x x C C o o n n t t i i n n u u e e d d G G When finished linking the entire Bank of machines verify the EGMs are communicating properly with Vertex Once a machine is linked the EGM ID will appear in GREEN when the machine is successfully communicating with the Jackpot Controller The EGM ID will appear in RED to indicate faulty communication See below S ST TE EP P 9 9 C C o o m m ...

Reviews: