background image

Figure 4 The arch installation

Assemble each arch on ground. Each arches

consist of:
One Top roof tube (Part #1)
Two Roof curving tube (Part # 2/2A/2B)
Two Sidewall tube (Part # 3/3A/3B/3C)

Connect the arches by Using the hexagon

bolts with washers and nuts through predrilled
holes in frame members. Do not tighten down
the nuts completely until frame is fully

assembled and set in place.

Step #2 --ARCH ASSEMBLY

THE FRONT AND BACK PANEL
FRAME ASSEMBLY

Assemble the front and back panel frame.
According to Figure 5&6, connect the end
wall frame by Using the bolts with washers

and nuts through predrilled holes in frame

members. Do not tighten down the nuts

completely until frame is fully assembled and
set in place.

Figure 6 Frame Installation
for Back Panel

NOTE: Please notice that the part code of the

arch sections. The sections of different arches
are not the same.  Check with the Part List and

the Sketch Figure #1.

NOTE: The Arches, the Front and Back panel

should be assembled well on the ground, before
erected into the Base Flanges.

1

2/2A/2B

3/3A/3B/3C

Figure 5 Frame Installation
for Front Panel

10

11

12

12A

13

13A

3C

2A

1

3A

1

2B

3B

16

17

14

15

Summary of Contents for JIT-2359J

Page 1: ...SHELTER MODEL JIT 2359J L18 0xW7 0xH4 8m Assembly Manual www vikre no...

Page 2: ...snow drifts n slippery places or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a punctur...

Page 3: ...me and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc Be taken off and the cover will not be blocked during the way Avoid taking off the cover with h...

Page 4: ...Base plate at front panel 2 9 Base plate at back panel 2 10 Door beam 1 1 11 Upper door track 2 12 Lower door track 1 12A Lower door track to connect the lower beam 1 13 Upper beam of front panel 2 13...

Page 5: ...over 1 32 Back cover 1 34 Band for tie down ratchet 20 35 Rope for fastening the two ends of roof cover the front door back cover 11 36 Plastic cap for tensioning tube 10 37 Door dropping tube in the...

Page 6: ...1 2B 3B 2 3 4 5 6L 6R 7R 7L 8 9 10 11 12 12A 13 13A 14 15 16 17 20 21 3B 25 2B 4 26 Figure 1 Sketch of JIT 2359J 2A 28 11 2A 3A 3C 5A...

Page 7: ...langes with Stake Pegs Part 23 Measurements shown in Figure 2 are to the center of the upright sockets on each Base Flange The Shelter must be secured to a firm surface that can receive and retain aug...

Page 8: ...nel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts completely until frame is f...

Page 9: ...ly continues Next stand first interior arch up to repeat insertion into Base flanges Immediately after putting first interior arch into place connect Front Arch and Interior arch using Roof Purlin Tub...

Page 10: ...Cover unpack cover and lay parallel to building frame on one side Cover must be pulled over top of frame assembly without being snagged or stressed on any frame members Use multiple ropes over top of...

Page 11: ...ep Step 7 TIGHTEN ROOF COVER ON FRAME FRONT TO BACK The roof cover is tensioned from front to back by the rope lacing to grommet flaps inside the main cover inside the unit at both front and rear arch...

Page 12: ...Figure 11 Fastening the two ends of the Roof Cover Figure 12 Installation of the Front Cover Figure 13 Installation of the Back Cover 32 31 35...

Page 13: ...cket on one side The rope ties off to the loop that is located on the Base Flange in Corner part 6 Moving to the other side begin to pull the rope down Hold the rope in hand and push down at the botto...

Page 14: ...t install the steel wire that leads from the bottom of the door dropping tubes to the door winching assembly Take one of the Steel Wires in the Door kit and feed down from the top of the Door track to...

Reviews: