<9. Inspection and Maintenance>
9-15
IM 11Y01D01-01EN
Calibration Cell
Figure 9.8
Connection example for offline work
9.3.1 Preparation
If you want to perform calibration or offline validation, prepare the following tools, instruments,
nitrogen gas, and gas for offline work (check gas, zero calibration gas (nitrogen gas), span
calibration gas).
No.
Tool or instrument
Quantity
Remarks
1 Calibration cell
1
2
YH8000 or HART configuration
tool
1
For executing offline calibration and validation
3 Cable between the LU and SCU
1
4
24 V DC power cable
1
5
Valve drive cable
As required (1 or 2)
For controlling valves automatically through the
SV terminal
6 YH8000 connection cable
1
When using the YH8000
7
24 V DC power supply
1
8 1/4 inch piping
Several meters
9
1/4 inch ferrule set
As required
10 Pressure regulator
1
11 1/4 inch pipe plug
2
12 Three-way valve
As required
13 Thermometer
1
14 Pressure meter
1
15 Coupling
As required
16 Nitrogen gas
As required
For TDLS8000 purging
For zero calibration
17 Span calibration gas
As required
For span calibration
18 Check gas
As required
For offline validation
19
Flowmeter
3
For TDLS8000 purging
For zero calibration
For span calibration and offline validation
20 Needle valve
3
For flow rate adjustment
3rd Edition: Jun. 10, 2016-00
Summary of Contents for TDLS8000
Page 10: ...ix IM 11Y01D01 01EN LT LV PL EST SLO H BG RO M CZ SK 3rd Edition Jun 10 2016 00...
Page 25: ...Blank Page...
Page 45: ...Blank Page...
Page 115: ...Blank Page...
Page 151: ...Blank Page...
Page 231: ...Blank Page...
Page 239: ...Blank Page...
Page 243: ...Blank Page...
Page 261: ...Blank Page...
Page 303: ......
Page 305: ......
Page 307: ......
Page 309: ......
Page 311: ......
Page 313: ...Blank Page...