background image

for use by heating contractor

5285 428 - 03  03/2015

Technical Data Manual

VITOROND 200

Vitorond 200 VD2 Series

Triple-pass hot water heating boiler

1255 to 4387 MBH (368 to 1285 kW)

Vitorond 200

Oil-/Gas-fired boiler 

sectional cast iron design with Eutectoplex heat transfer surface, in triple-pass design

for operation with modulating water temperatures

Heating input:   1255  to  4387 MBH 

(368   to  1285 kW)

Product may not be exactly as shown

Summary of Contents for VITOROND 200 Type VD2

Page 1: ...pass hot water heating boiler 1255 to 4387 MBH 368 to 1285 kW Vitorond 200 Oil Gas fired boiler sectional cast iron design with Eutectoplex heat transfer surface in triple pass design for operation w...

Page 2: ...mperature distribution further increase the level of operational reliability H Problem free transport into difficult to access boiler rooms due to sectional construction and low weight of individual s...

Page 3: ...em up to 4 boilers 14 Vitotronic 100 type GC1B and LON module 14 Vitotronic 100 type GC1B and LON module 14 Vitotronic 300 K MW1B control panel 14 For single or multiple boiler installations 14 Custom...

Page 4: ...exchanger surface constructed from homogeneous special gray cast iron Product may not be exactly as illustrated Third pass Vitotronic control intelligent and easy to install operate and service Burner...

Page 5: ...Cast iron block dimensions Length in mm 57 1450 62 1580 67 1710 72 1840 77b 1970 82b 2100 88 2230 93 2360 98 2490 103 2620 108 2750 Width in mm 40b 1030 40b 1030 40b 1030 40b 1030 40b 1030 40b 1030 4...

Page 6: ...3 160 353 160 353 160 353 160 353 160 353 160 Rear section with flue gas collar lbs kg 507 230 507 230 507 230 507 230 507 230 507 230 507 230 507 230 507 230 507 230 507 230 Cast iron heat exchanger...

Page 7: ...563 1398 634 1552 704 1730 785 1907 865 2110 957 2394 1086 Boiler standby loss based on max heating input and hot water supply and return temps of 167 140 F 75 60 C 0 40 0 38 0 35 0 32 0 31 0 29 0 28...

Page 8: ...be diameters of 7 to 11 in 180 to 280 mm the door insulation refractory material can be cut to the required size The blast tube must protrude from the thermal insulation on the boiler door Legend BD B...

Page 9: ...sion tank SS Safety supply connection to pressure relief valve Low temperature protection Low temperature protection packages from Viessmann are required for Rondomat boilers A 30 Boiler Flow Package...

Page 10: ...g the boiler pump normally supplied with the 100 Boiler Flow Package to verify that all pumps in the system operate correctly The responsibility for the distribution system design including all circul...

Page 11: ...tle brush for heat exchanger cleaning IMPORTANT Minimum side clearance of 20 in 500 mm must be maintained for side mounted Vitotronic controls Recommended Minimum Clearances Boiler model VD2 320 VD2 3...

Page 12: ...review the system design if more balancing valves are required to properly balance the system Viessmann can supply TA Victaulic balancing valves upon request The balancing should be carried out by a c...

Page 13: ...fired 149 F 65 C min return water temperature 127 F 53 C The Viessmann or Vitotronic control system Setback operation Minimum boiler water temperature Oil fired 122 F 50 C Gas fired 140 F 60 C For mu...

Page 14: ...ure in conjunction with an external control unit BMS H with Vitocontrol control panel Vitotronic 100 GC1 GC1B and LON module for modulating boiler water temperature for each boiler of the multi boiler...

Page 15: ...s critical that the chimney system be properly designed to handle the relatively cool flue gas temperatures produced by the Vitorond 200 VD2 boiler If the chimney system lacks sufficient insulation an...

Page 16: ...sion caused by flue gas condensation due to low boiler water and or return water temperatures Operation with contaminated fill and supplementary feed water System layout The boiler water temperature l...

Page 17: ...burner start up procedures Burner manufacturer Weishaupt or Riello Burner Gas train approval Standard approvals are CSA for Canada and UL for U S IRI and FM approved equipment is also available please...

Page 18: ...GL10 1 WM GL10 2 WM GL10 3 WM GL10 4 WM GL20 2 Riello Burners Boiler model VD2 320 380 440 500 560 630 700 780 860 950 1080 No 2 oil fired 2 stage Model RL28 2 RL38 2 RL50 2 RL50 2 RL100 2 No 2 oil f...

Page 19: ...19 5285 428 03 Vitorond 200 VD2 Series 320 to 1080 Technical Data...

Page 20: ...Technical information subject to change without notice Printed on environmentally friendly recycled and recyclable paper 5285 428 03 Vitorond 200 VD2 Series 320 to 1080 Technical Data...